Additionally, major tests are carried out at 'pre-delivery' stage between superstructure and interior assembly and in the detailed seas trial and compliance audit carried out posconstruction.
此外,在“交付之前”阶段上册建筑与内部组装之间,会执行一些主要的测试,对详细海域试验会执行符合性审计。
When the mold is completed, engineers will arrange trial production, assembly and various tests.
当模具完成后,工程人员将会安排试产、组装及各项测试。
Produce a trial swaged assembly and check the size.
试扣压一个总成检测尺寸。
Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.
安装检查&测量应在主要结构设备安装前后进行。 在设备冷试车之前应联合检查设备对位情况。
Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.
安装检查&测量应在主要结构设备安装前后进行。 在设备冷试车之前应联合检查设备对位情况。
应用推荐