• We provide Assembly and test as well as a complete machining system capability.

    威斯·泰克提供装配测试以及成套加工系统

    youdao

  • Complete assembly and test capability to customer approved acceptance procedures (ATP).

    完整组件测试能力已经过客户认证和认可

    youdao

  • Our sales experience and list of equipment covering all major PCB assembly and test equipment.

    我们销售经验设备清单涵盖了所有主要PC B装配测试设备。

    youdao

  • Amkor helped make these visions a reality by pioneering the outsourcing of semiconductor assembly and test services.

    靠率先通过外包半导体封装测试服务方式使这些幻想变成现实。

    youdao

  • Define and design tooling, fixtures andprograms used in assembly and test process, lead regular tooling/fixture/program verificationor calibration activities.

    定义设计装配测试过程使用工装夹具程序领导定期工具/夹具/程序确认或校验活动。

    youdao

  • It is mainly engaged in assembly and test of operating Pedestals, oil sources and front box components of steam turbine, gas turbine or wind power equipments etc.

    主要从事汽轮机燃机风电产品操纵装配试验装配、试验;装配、试验;

    youdao

  • In the missile seeker infrared tracking system, the parabolic mirror is one of the important components. Thus the very high demand is put forward to its assembly and test.

    导弹导引头红外跟踪系统中,抛物面反射镜其中重要部件因而装配测试提出很高要求

    youdao

  • Right-click on the export on the Assembly Diagram and select Test Component (see Figure 16)

    组装关系右键单击导出选择TestComponent参见 16)

    youdao

  • Results for HTTP put and delete actions now appear in the Test tab of the Package Assembly Tool.

    HTTPputdelete行为结果现在可以显示PackageAssemblyToolTest标签上

    youdao

  • Right-click the canvas in the assembly diagram and select Test Module.

    组装关系图中右键单击画布选择Test Module。

    youdao

  • Open the publisher assembly diagram, right-click in the diagram and click Test Module.

    打开发布者组装关系右键单击关系图单击TestModule

    youdao

  • Wire the test module to the mock service module by expanding the MT_TestArchiveRetrievalApp module, and open its assembly diagram.

    通过展开MT _ TestArchiveRetrievalApp模块打开组装测试模块连接模拟服务模块。

    youdao

  • If you want to test all of the components of your module, then you can right-click the assembly editor canvas and select test module.

    如果需要测试模块所有组件可以右键单击组装编辑器画布选择Test Module。

    youdao

  • Typically, you would test a module by right-clicking the module in the Business Integration view, or by right-clicking the module assembly diagram and selecting test module.

    通常通过BusinessIntegration视图右键单击模块右键单击模块组装关系图选择TestModule来测试模块。

    youdao

  • You can run the component test feature by right-clicking the appropriate SCA component in the Assembly Diagram and choosing test component as shown in Figure 9.

    可以通过装配关系图中右键单击相应SCA组件选择TestComponent运行组件测试功能如图9中所示。

    youdao

  • Retest the EJB via the import: right-click on the TemperatureEJB import on the Assembly Editor canvas and select test Component.

    通过导入重新测试e JB组装编辑器画布上右键单击TemperatureEJB导入,选择Test Component。

    youdao

  • Now we'll add the rule group to your assembly diagram and test it.

    现在我们规则添加组装关系图进行测试

    youdao

  • The company is now prepared to complete the design, assembly and integration of the beam control system, leading up to a test in 2010.

    目前公司正在准备完成设计、对光束控制系统进行集成,并最终于2010年进行测试

    youdao

  • It is time to save our work and to test our patched assembly.

    现在时候拯救我们工作测试我们的补丁装配

    youdao

  • Let's save and test our patched assembly.

    保存测试我们补丁装配

    youdao

  • The manufacturer of all PVC or CPVC bleach ball valves must complete all components prior to the factory assembly, test, and packaging of those valves.

    所有PVCCPVC漂白剂球阀制造商必须进行工厂组装测试阀门包装之前全部完成所有部件的生产。

    youdao

  • After the first assembly of your parachute you must perform an opening test and, before every take off, you must control the proper position of the handle.

    第一装配滑翔伞之后,必须进行一个检测,在每次离开地面之前,您必须控制手柄适当位置

    youdao

  • Company Sets machining and assembly in one, with a comprehensive means test and improve the quality of management.

    公司机加工装配一体拥有完备检测手段完善质量管理

    youdao

  • Right click the canvas in the assembly diagram and select Test Module.

    组装关系图中右键单击画布选择Test Module。

    youdao

  • Design output should provide necessary data for purchase, fabrication, test, assembly, use, maintenance and service. Documents should be established for design output, including.

    设计输出应为采购制造检验、试验、装配使用维护服务提供必要依据。设计输出形成文件,文件包括

    youdao

  • Design concept and concrete scheme of a test bench for hydro-mechanical transmission assembly on loaders are depicted in the article.

    介绍一种装载机液力机械传动变速器总成检测试验台设计思路具体方案

    youdao

  • To run this test, I'll need to build the project, open the generated assembly in the NUnit application, and then click the run button.

    运行测试需要生成项目NUnit应用程序打开生成程序集然后单击Run按钮

    youdao

  • The first two lines of assembly code at B0 and B5 load the instance reference from memory location 049388C8 into eax and test for null.

    B0B5 处汇编代码将 instance引用内存位置 049388C8 加载eax 中进行 null 检查。

    youdao

  • After performing the shorts and opens test the in-circuit tester tests each component on a PCB assembly one at a time.

    短路、开路测试完成以后在线测试仪需要在同一时间印刷电路板上的一个器件进行测试

    youdao

  • Plan and organise relevant pre-assembly; function test and in-process quality inspections during workshop assembly.

    计划组织相关组装和功能测试和在车间装配过程中进行质量监测

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定