• The construction of ash dam in Weishui Power Plant adopts the multi stage pulverized coal ash subdam technology.

    微水电厂贮灰坝的施工采用了多级粉煤灰子坝技术。

    youdao

  • A series of tests with the portable dynamic penetrometer of type PANDA have been carried out, to inspect the grinding quality of the secondary ash dam.

    为检测子级灰坝的碾压质量,运用一种轻便动力贯入仪对粉煤灰进行了一系列现场试验。

    youdao

  • According to rock soil engineering properties and dynamic character of the ash dam of Anyang Power Plant, the dynamic analytical model is set up by the finite element method.

    根据安阳电厂灰坝岩土工程性质及其动力学特性,建立了适合灰坝工程的动力分析模型并采用有限元法进行了动力分析。

    youdao

  • According to rock soil engineering properties and dynamic character of the ash dam of Anyang Power Plant, the dynamic analytical model is set up by the finite element method.

    根据安阳电厂灰坝岩土工程性质及其动力学特性,建立了适合灰坝工程的动力分析模型并采用有限元法进行了动力分析。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定