The anchoring or set to the artificial bottom hole of the separate injection pipe string has solved the creep of the pipe string resulted from the unstable water injection pressure.
分注管柱实施锚定或支撑到人工井底,克服了管柱因注水压力不平稳等原因造成的管柱蠕动现象;
The anchoring or set to the artificial bottom hole of the separate injection pipe string has solved the creep of the pipe string resulted from the unstable water injection pressure.
分注管柱实施锚定或支撑到人工井底,克服了管柱因注水压力不平稳等原因造成的管柱蠕动现象;
应用推荐