• Concrete was poured in separately from mid-span of arch slab to the supports and then from the supports to the top chord of the arch chord so as to balance the pouring load.

    分两组由拱板下弦跨中同时向拱板支座浇筑混凝土,然后从拱板支座连续沿拱板上弦向中间合龙,使浇筑荷载相对均衡。

    youdao

  • Concrete was poured in separately from mid-span of arch slab to the supports and then from the supports to the top chord of the arch chord so as to balance the pouring load.

    分两组由拱板下弦跨中同时向拱板支座浇筑混凝土,然后从拱板支座连续沿拱板上弦向中间合龙,使浇筑荷载相对均衡。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定