• Taking Heping Bridge engineering as an example, the deformation of arch scaffolding loading procedure and stress calculation of drafted by construction units are carried out.

    结合和平大桥工程实例,开展了施工单位拟定加载程序变形应力计算

    youdao

  • Arch bridge can be constructed over a falsework, or temporary scaffolding.

    曲拱桥梁可以修建在脚手架或者临时脚手架。

    youdao

  • Arch bridge can be constructed over a falsework, or temporary scaffolding.

    曲拱桥梁可以修建在脚手架或者临时脚手架。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定