• The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper.

    本文首次系统地对拱坝坝身泄洪孔口、泄流过程以及下水布置优化问题进行了讨论

    youdao

  • The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper.

    本文首次系统地对拱坝坝身泄洪孔口、泄流过程以及下水布置优化问题进行了讨论

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定