Scroll down to your project if necessary, and select the check box for Request Approval.
需要时将向下滚至您的项目,并选择RequestApproval复选框。
Sometimes project teams could be disbanded because they're just waiting for approval, and then it is difficult to put them back again.
有时项目团队因为只能等待批准交付物而被解散,日后让他们重回项目团队非常困难。
A project management account to which the most aspirational tickets - stuff you'd really like to do but will probably never get approval for - gets assigned.
一个项目管理部门对分配到最向往的票——你真的想去做却很可能永远不被允许的事,的解释。
Your job dissatisfaction may be the result of barriers to efficiency in your office, such as a complicated approval process that drains your excitement for a project as it drags on.
你对工作的不满也许来自于你办公室里一些影响效率的障碍,比如一个复杂的审批流程会让你对一个项目的激动之情在拖拉中消耗殆尽。
The Contractor shall note that all material, product and equipment submittals require approval of the Project Manager after the same have been reviewed by the Consultant for acceptance.
承包商应注意,其所有材料、产品和设备提交项在经顾问审核接受之后,必须还要经过项目经理批准。
Support project manager for all technical matters. Attend design meetings with client and monitor client's design approval.
为项目经理提供技术支持。参加客户的设计会议并监督客户的批准文件。
After ramp up, NPI project leader will submit project closure report for review with cross function department, then close whole NPI project after approval.
在爬坡量产后,项目团队领导人提交项目结束报告给各职能部门进行审核,在批准后正式关闭整个新产品导入项目。
This project will do some constructive work, and from a technical point of view to provide the technical basis for project approval.
将对此项目做一些建设性的工作,并从技术的角度对项目审批提供技术依据。
When you send an update for your timesheet, the new task will be submitted to the appropriate project manager for approval.
当您发送时间表的更新时,新任务将提交给适当的项目经理以便获得批准。
The Group's branches (subsidiaries), wholly-funded and holding project companies shall draft relevant systems according to this system and implement after reporting to the Group for approval.
集团所属各分(子)公司、全资和控股项目公司应根据本制度拟定相关制度,并报集团审批后执行。
Design team leader is responsible for working out product development plan and submitting to project manager for approval.
设计小组组长负责制订《产品开发计划》,报项目经理批准。
When you send an update for your timesheet, the new task is submitted to the appropriate project manager for approval.
当您发送时间表的更新信息时,新任务将被提交给相应的项目经理以供审批。
The carpeting subcontractor has, without prior approval, installed carpet that is a slightly different pattern from the pattern selected for the project.
未经事先批准,地毯分包商安装了与项目预定的图案稍微不同的另外一个地毯。
The controlling documents are established by project group and shall be submitted to technical head for approval.
项目组负责编制文件控制并报技术总负责审批。
Centralize the project approval power for projects in sectors of overcapacity, and limit the issuance of new production licenses for steel and cement projects.
集中那些产能过剩行业的项目审批权,并限制对钢铁、水泥项目的新的生产许可证的发放。
Since the contract signed, and the project construction goes along well with the prescribed time, land approval and other relevant procedures will be undertaken for free.
企业与园区签订入园协议,在规定时限内开工建设和投产,园区无偿代办项目审批、土地报批等有关手续。
You put a mirror on the mountain to reflect the SUNS rays into your main square, says the mayor of Viganella, who has just presented the project to Italys Piedmont region for approval.
意大利维格尼拉镇镇长说:“你可以在山上安一面镜子,将阳光线反射到大广场上”。该镇长已把这个方案呈报给意大利皮埃蒙特地区,等待批准。
After being examined for approval the project proposals and feasibility study reports will be filed with the above-mentioned Commission or Office.
并将审批后的项目建议书和可行性研究报告报上述委办备案。
By the end of week 3, request approval from instructor for any project topic not on original list.
所有不列于上表之题目,须于第三周结束前向教师申请批准。
You put a mirror on the mountain to reflect the sun's rays into your main square, says the mayor of Viganella, who has just presented the project to Italy's Piedmont region for approval.
意大利维格尼拉镇镇长说:“你可以在山上安一面镜子,将阳光线反射到大广场上”。该镇长已把这个方案呈报给意大利皮埃蒙特地区,等待批准。
When examining and approving the feasibility report of the project, the government agencies in charge of the examination and approval should check and determine the prescribed quota for sale.
项目审批机关在审批可行性研究报告时,要核定项目的结汇额度。
All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Project Manager before this use.
承包人为临时或永久工程的施工准备的图纸在使用前必须提交项目经理预先批准。
High level of understanding for the power project approval process especially in local area;
对电力项目审批流程(尤其是当地的)有深度的了解;
The acceptance check of safety evaluation for non-coal mine is one of the main basis for safety inspection and approval of non-coal mine construction project.
非煤矿山安全验收评价是矿山建设项目安全验收与审批的主要依据之一。
Abstract: Highway engineering feasibility study report is critical of the preliminary work of road construction and an important basis for project approval and post-construction drawing design.
摘要:公路工程可行性研究报告是公路建设前期工作的关键,是项目立项和后期施工图设计的重要依据。
Abstract: Highway engineering feasibility study report is critical of the preliminary work of road construction and an important basis for project approval and post-construction drawing design.
摘要:公路工程可行性研究报告是公路建设前期工作的关键,是项目立项和后期施工图设计的重要依据。
应用推荐