Finally we tests the performance by experiment in idling and load situation, which proves that electric circuit and the program achieves the anticipated plan.
最后通过实验验证电路在空载和负载情况下的性能,实验证明设计的电路和程序达到预期的设想。
This suggests that the build-up in supplies from new fields in the GOM area in particular is proving slower than anticipated and also that decline rates for mature, base load production are higher.
这表明,尤其是 墨西哥海湾 (GOM)地区新油田所增加的供应量证明是低于预期的,而且对到期的、基线装载生产量的下降速度都是高水平的。
This suggests that the build-up in supplies from new fields in the GOM area in particular is proving slower than anticipated and also that decline rates for mature, base load production are higher.
这表明,尤其是 墨西哥海湾 (GOM)地区新油田所增加的供应量证明是低于预期的,而且对到期的、基线装载生产量的下降速度都是高水平的。
应用推荐