• Level 2 can be used for detailed modeling including event and exception handling and is described as analytical BPMN. It USES a wide range of BPMN constructs.

    层次2包括事件异常处理详细建模它描述分析BPMN使用多种结构BPMN。

    youdao

  • The author in this discussed shallowly constructs the construction enterprise quality control, and does the brief analytical study.

    笔者浅谈一下建筑施工企业质量管理,并作简要分析研究。

    youdao

  • The author in this discussed shallowly constructs the construction enterprise quality control, and does the brief analytical study.

    笔者浅谈一下建筑施工企业质量管理,并作简要分析研究。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定