Hybrid FPA works the same way, but only USES pre-tilting on one side of the substrate alignment layer.
Hybrid FPA以同样的方式工作,但是只在一边的基质配向层使用了预倾斜。
The Contractor shall be responsible for the correct positioning of all parts of the works, and shall rectify any error in the positions, levels, dimensions or alignment of the works.
承包商应负责对工程的所有部分正确定位,并应纠正在工程的位置、标高、尺寸或定线中的任何差错。
The Contractor shall be responsible for the correct positioning of all parts of the works, and shall rectify any error in the positions, levels, dimensions or alignment of the works.
承包商应负责对工程的所有部分正确定位,并应纠正在工程的位置、标高、尺寸或定线中的任何差错。
应用推荐