• The Beijing Capital International Airport Terminal 3 is a continuation project for 2008 Olympic Games, and the Ground Transportation Center (abbr. GTC) is an important part of this project.

    北京首都国际机场3号航站楼为了迎接2008年奥运会进行扩建项目

    youdao

  • In Terminal T3B Project of Beijing Capital International Airport, the reinforced concrete ring beam is a type of transfer beam supporting gigantic steel pipe columns.

    北京首都国际机场航站楼t3b工程中,钢筋混凝土环形支撑巨型钢管转换梁。

    youdao

  • The first phase of airport expansion project is expected to be completed at the end of 2012, when the Chingchuankang airport terminal area will be increased to 20,000 square meters, about 3 times now.

    机场第一阶段扩建工程预计于2012年底完工届时清泉岗机场航厦面积增至20000平方米约为目前的3

    youdao

  • An existing tunnel beneath Terminal 2 building reserved for the Taoyuan International Airport Link Metro Project was enlarged to accommodate the new alignment of Metro rail.

    桃园国际机场第二航厦下方预留捷运机场线的隧道,由于规划路线改变,需要扩大该隧道断面;

    youdao

  • An existing tunnel beneath Terminal 2 building reserved for the Taoyuan International Airport Link Metro Project was enlarged to accommodate the new alignment of Metro rail.

    桃园国际机场第二航厦下方预留捷运机场线的隧道,由于规划路线改变,需要扩大该隧道断面;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定