• This article analyses the factors and adjustment method of material price difference for large-scale projects, and then presents the merit and disadvantage of different adjusting methods.

    本文大型工程项目材料价差调整要素、调整方法进行了分析提出了选用不同调整方法利弊

    youdao

  • In the process of lead-free, because of the difference of lead-free solders and adjustment of technical parameter, we will face many new problems of reliability.

    无铅化进程由于无铅焊点焊料不同焊接工艺参数调整,必然给焊点可靠性带来许多新的影响。

    youdao

  • Because of the difference between the adjustment object and method, every ordinary law has their own task and emphasis.

    部门法之间由于调整对象调整方法不同分工侧重

    youdao

  • Results The difference of average bonus to nurses after adjustment between in-patient departments and out-patient departments is prominent.

    结果调整门诊病房护士人均显著性差异

    youdao

  • The installation of machine tools within the region, if the ground plane height difference over the adjustment range of this product, you can set the machine and load has increased by pads.

    机床安装区域如果地基平面高度超过产品调节范围时,可以在机床负荷盘间增加垫片

    youdao

  • Both parties agree, shall the quality of the loaded cargo difference from of the quality as stipulated in article 1 aforementioned, the following price adjustment shall be effect.

    双方同意如果实际装运货物合同第一规定的质量差别,则价格有所调整

    youdao

  • This article analyses the factors and adjustment method of material price difference for large-scale projects, and then presents the merit and disadvantage of different adjusting methods.

    对高速公路工程项目材料差价调整要素、调整方法进行了简述,不同调整方法选用提出了具体的做法,对指导高速公路工程建设具有较高的参考价值

    youdao

  • Because of big difference among the members, up to now, there is no any achievements of text in line with the adjustment of DSU.

    但由于成员意见分歧较大目前为止,还没有就DSU修改达成一个本性的成果

    youdao

  • This article analyses the factors and adjustment method of material price difference for large-scale projects, and then presents the merit and disadvantage of different adjusting methods.

    公路工程项目调整要素、调整方法以及不同调整方法的选用提出了具体做法,指导公路工程建设具有较好的参考价值

    youdao

  • The paper proposed specific methods for adjustment factors, methods and choice of materials price difference for highway engineering project.

    本文大型工程项目材料价差调整要素、调整方法进行了分析,提出了选用不同调整方法的利弊。

    youdao

  • The paper proposed specific methods for adjustment factors, methods and choice of materials price difference for highway engineering project.

    本文大型工程项目材料价差调整要素、调整方法进行了分析,提出了选用不同调整方法的利弊。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定