A structural engineer who designs a bridge doesn't deliver an actual bridge.
设计桥梁的结构工程师不会交付真正的桥。
This method was validated by the actual bridge.
利用实桥对该方法进行验证。
On the base of actual bridge observation and test research, this paper discusses the temperature stress effect to concrete box girders which caused by temperature load.
在实桥观测与试验研究的基础上,对温度荷载所产生的温度应力对混凝土箱梁的作用进行了探讨。
This paper USES the principle of energy to obtain the approximate solutions for the cable-stayed Bridges. The method of successive approximation has been applied to the analyses of the actual bridge.
本文采用能量原理,导出斜拉桥的近似解答,并利用逐次渐近法对一座实际桥梁进行数值计算。
This paper USES the principle of energy to obtain the approximate solutions for the cable-stayed Bridges. The method of successive approximation has been applied to the analyses of the actual bridge.
本文采用能量原理,导出斜拉桥的近似解答,并利用逐次渐近法对一座实际桥梁进行数值计算。
应用推荐