Modeling activity output is captured and stored using PowerPoint or a drawing tool.
利用PowerPoint或绘图工具获取并存储建模活动输出。
Activity-based costing(ABC)is an important concept in Management Accounting, and the same is true with input-output analysis in Statistics.
正如作业成本是管理会计学中的重要概念,投入产出分析也是统计学中的重要概念。
In the next steps, you create another snippet activity to create the file name for the output file.
在下面的步骤中,您要创建另一个代码片断活动,以创建输出文件的文件名。
If no output is provided for an invoke or human task activity, the process variable is not updated.
如果没有为调用活动或人工任务活动提供任何输出,则不会更新流程变量。
The definitions of the input and output criteria are part of the activity definition; they cannot be changed in any process model that reuses this task.
输入和输出条件的定义是活动定义的一部分,它们不能在任何重用这一任务的流程模型中被更改。
This command essentially writes to standard output the contents of the cumulative activity, which you would have selected as its flag.
此命令实际上就是将选择作为其标志的积累活动的内容写入到标准输出。
In activity form, you capture the decision conditions as post-conditions of the output criteria.
在活动形式中,决策条件将被捕获为输出条件的后置条件。
Activity form using input and output criteria, but no gateways, is more suitable for simplifying visualization of the process model by hiding the branching logic in the input and output criteria.
活动形式使用输入和输出条件,但不使用网关。它将分支逻辑隐藏在输入和输出条件中,因而更适于简化流程模型的可视化形式。
When an activity executes, it produces all outputs of exactly one output criterion.
当活动执行时,它将正好产生一个输入条件的所有输出。
A process model that makes use of several input and output criteria in the activities, but does not use gateways is denoted as being in activity form.
如果流程模型在活动中使用多个输入和输出条件,但并不使用网关,则表明它采用的是活动形式。
In Listing 5, the process provides an in-out operation: the input message of this operation is consumed by the activity, and the output message of this operation is produced via the activity.
在清单5中,该流程提供了一个进出操作:该操作的输入消息被活动所消费,该操作的输出消息是通过活动来产生的。
Instead, the names of the input and output pins on the actions are labeled by a parameter, variable, or structural feature in the context classifier (the class owning the activity) that is in scope.
相反,操作上输入与输出的名字,会标上范围内背景标识符(拥有活动的类)中的参数、变量或者结构性特性。
The output criterion it chooses can depend on which input criterion activated the activity.
它选择的输出条件取决于激活该活动的输入条件。
Alternatively, a cycle can begin in a separate output criterion of an activity and end in a separate input criterion of this or another activity.
另外,循环也可以从活动的单独输出条件开始,并在该活动或其他活动的单独输入条件中结束。
Much of the recent weakness in output growth is thanks to the fall in building activity.
由于建筑活动的下降导致许多近日来产出增长上的疲软。
An activity frame represents current activity and allows adding activity parameters by using input or output pins.
活动框架代表了当前的状态,并通过使用输入和输出针脚来允许添加活动参数。
When a receive activity belongs to a request-response operation, a reply activity returns the output of the operation.
当接收活动属于请求-响应操作时,应答活动会返回操作的输出。
In some cases, the business analysts may even define somewhat precisely the structure of the information and the output that goes into each activity.
在一些情况下,业务分析员甚至可以精确地定义信息的结构和进入每个活动的导出。
The figure below shows how an Assign activity copies the output of one task to the input of a subsequent task by copying the message parts of variables.
下图显示了一个分配行为如何通过复制变量的信息部分将任务的输出信息复制到后续任务的输入端。
This is treated as the normal output of the activity and the process variables are updated, respectively.
它被视为活动的常规输出,并相应地更新流程变量。
Instead, the parameters of the activity (which must correspond to the parameters of its specification operation) are referenced directly on input and output pins where needed.
相反,活动的参数节点(必须同其规范操作的参数相一致)根据需要被直接引用到输入和输出插口上。
You could also select Output to initiate another correlation set when a reply of an invoke activity is received.
当接收到调用活动的应答时,您还可以选择使用Out put来启动另一个相关集。
Since it not connected as an output, i.e., it is not used by any subsequent activity, we removed it from the merge in the pattern in Figure 4.
由于它不是作为输出进行连接的(即它没有被任何一个后继活动所使用),我们在图 4的模式中,将它从merge 中移除。
On the next screen, you can edit the output message of activity ProvideCustomerData.
在下一个屏幕中,您可以编辑活动providecustomerdata的输出消息。
To verify that you were successful, use the output parameter feature of the Direct Transfer activity.
为了检验操作是否成功,可以使用DirectTransfer活动的输出参数特性。
Reply activity is mapped to the output string decision.
Reply活动被映射到输出字符串决策。
After it had consumed around 100mb, there was a drastic jump in the values of PI and Po fields from vmstat output, which indicates increased paging activity.
当消耗的内存达到100MB左右之后,vmstat输出中的pi和po字段值急剧增加,这说明分页活动增加了。
Wire the new InvokeOrderValidation activity to the partner link and operation and to the input and output process variables you created above, as shown in Figure 15.
将新的InvokeOrderValidation活动连接到上面创建的合作伙伴链接和操作以及输入和输出流程变量,如图15所示。
Cockburn introduces the topic by asserting the basic idea that the key output of design activity is knowledge creation.
Cockburn的阐述从一项基本断言入题——设计活动的关键产出是创造知识。
When activity occurs, inetd maps the incoming request to standard input (stdin), standout output (stdout), and standard error (stderr) and launches the proper daemon.
当发生活动时,inetd 把入站请求映射到标准输入 (stdin)、标准输出 (stdout)和标准错误 (stderr),并启动适当的守护进程。
应用推荐