The above discussions on migration to SOA and the additional activities after realization deserve an article of their own, which I will get to in a subsequent column in this series.
上面的关于移植到SOA和实现以后附加活动的讨论应该得到它们自己的文章,本系列中我将在随后的列中接触到这个。
These activities are mapped to the standard roles that participate in the given activity, which can be listed in the far right column.
这项活动描绘了标准的角色,在最右端列出来。
Select My To Dos in the left column, which lists the staff activities that are present.
在左栏中选择MyTo Dos,其中将列出现有的成员活动。
In the left column, list five activities that you enjoy and have fun with, and do most frequently.
在左面一栏,列出五项你喜欢并且玩得高兴的、经常做的活动。
In the right column, list five activities that you find complicated, and don't engage in frequently.
在右面一栏,列出五项你觉得复杂并且不常参与的活动。
Data sources are produced by activities. So for "When to collect (the Data source)?", refer to the "Schedule" column of the corresponding activity.
数据来源于项目活动。所以“何时收集数据”可以参见“教学活动表”中的“时间安排”一栏。
Because of frequent activities in ancient volcanic mountain area, presents unique peak, column, pier, the hole, wall etc odd rocks is basically a modelling step, geomorphic museum.
由于处在古火山频繁活动的地带,山体呈现出独具特色的峰、柱、墩、洞、壁等奇岩怪石,称得上是一个造型地貌博物馆。
Because of frequent activities in ancient volcanic mountain area, presents unique peak, column, pier, the hole, wall etc odd rocks is basically a modelling step, geomorphic museum.
由于处在古火山频繁活动的地带,山体呈现出独具特色的峰、柱、墩、洞、壁等奇岩怪石,称得上是一个造型地貌博物馆。
应用推荐