Remark: Mold/Die contract shall describe that the Mold/Die could not be accepted till its 50pcs samples produced by relevant manufacturer were inspected and passed.
备注:模具合同中应注明该模具必须在移到使用的制造商处生产50模经检验样品合格后方可验收。
Remark: Mold/Die contract shall describe that the Mold/Die could not be accepted till its 50pcs samples produced by relevant manufacturer were inspected and passed.
备注:模具合同中应注明该模具必须在移到使用的制造商处生产50模经检验样品合格后方可验收。
应用推荐