• Those who make arbitrary use of a completed construction project which should conduct fire control design in accordance with law but has not passed or fail to pass the fire control acceptance check;

    依法应当进行消防设计建筑工程竣工时未经消防验收或者经验收合格擅自使用的;

    youdao

  • 4 4 Scope verification-formalizing acceptance of the completed project deliverables.

    4范围核实——正式验收已经完成项目可交付成果

    youdao

  • 4 4 Scope verification-formalizing acceptance of the completed project deliverables.

    4范围核实——正式验收已经完成项目可交付成果

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定