• It is big, though, with an 800-meter-long-main span that's the largest for a cable-stayed bridge in the nation, and the fifth largest globally.

    这座800大桥该国最长,世界第五长的斜拉索桥

    youdao

  • The Windows are incorporated between long-span beams that extend from the front of the building to a solid core containing the main technical and communications services at the rear.

    长跨之间窗户建筑物前部延伸包含主要技术通信服务实心核。

    youdao

  • The paper analyzes main technical characteristics of this new-type head span OCS, and the construction technique are studied, a viable improvement scheme is offered.

    本文分析新型软横跨接触悬挂主要技术特点施工技术进行了研究并提出了可行改进方案。

    youdao

  • The span between two such diaphragm walls can easily be bridged with precast reinforced concrete beams or a cast in-site reinforced concrete slab to complete the main shell of the tunnel.

    使用预制钢筋混凝土或者钢筋混凝土很容易两侧地下连续跨度空间连接起来,从而完成隧道

    youdao

  • Aiming at the main damage and its causes of a large-span continuous rigid framework bridge, the strengthening measure of adding the external cable to prestressed concrete box girder was introduced.

    针对大跨度连续刚构桥出现主要病害及其原因,介绍了采取增设预应力混凝土箱梁体外加固措施

    youdao

  • As a main part of workpiece, the performance and technics of dissimilar steel welding joints have a key impact on the life-span of workpiece.

    异种焊接接头作为工件主要部位性能工艺好坏直接影响着工件的使用寿命

    youdao

  • The court space of big span is situated on the lower part of main building, meeting function of use and traffic needs. It is really a perfect combination of building and structure.

    满足使用功能交通需要,将跨度空间法庭放在主楼低层部分,使其成为建筑结构完美结合的典范。

    youdao

  • In this paper, long-span rigid frame bridge construction control risk as the main object of study, a study around the following aspects: (1). Risk identification for bridge construction control error.

    本文大跨度刚构桥施工控制误差风险主要研究对象围绕以下几个方面展开研究:(1)进行桥梁施工控制误差风险识别

    youdao

  • The externally prestressed structural system means a prestressed structural system formed by prestressing cables arranged outside the structural element in its main span.

    体外预应力结构体系布置于承载结构主跨本体之外钢索施加预应力所形成的预应力结构体系。

    youdao

  • Xidan Station of Beijing subway is a large-span subway project first built under the main trunk road in downtown area in China.

    北京地铁西单车站我国首次繁华闹市区主干道修建跨度地铁工程

    youdao

  • The main bridge of Dalian Quanshui No. 4 Bridge is a box-section prestressed steel concrete two-hinged flat arch bridge with 88m span and 1/12 rise-to-span ratio.

    大连市泉水居住区四号路跨东北路桥主桥跨度为88,矢跨比1/12的形截面预应力钢筋混凝土

    youdao

  • The main bridge of Sanmenjiang Bridge in Liuzhou is a 3-span partial cable-stayed prestressed concrete box beam bridge with two pylons and double cable planes.

    柳州三门江大桥主桥双塔、双索面、三跨部分斜拉预应力混凝土箱梁

    youdao

  • The Hutiaomen bridge on Guangzhou-Zhuhai Railway is a continuous rigid-frame and flexible arch bridge with span arrangement for the main bridge being (120 + 248 + 120) m.

    广珠铁路虎跳门特大连续刚构-柔性拱桥主桥跨度布置(120 + 248 + 120)m。

    youdao

  • The Hutiaomen bridge on Guangzhou-Zhuhai Railway is a continuous rigid-frame and flexible arch bridge with span arrangement for the main bridge being (120 + 248 + 120) m.

    广珠铁路虎跳门特大连续刚构-柔性拱桥主桥跨度布置(120 + 248 + 120)m。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定