我写成本估算单。
Generally, the accuracy of a cost estimate will reflect the information available at the time of estimation.
总的来说,估价的准确程度将反映估价时所获取的信息。
A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。
It's very easy to estimate the scheduling cost of adding systems or replacing them when your machines will converge to a known state shortly.
当机器将很快收敛到一个已知状态时,就可以很容易地估计添加系统或替换它们的调度成本。
Moreover, this factor speaks yet again to the necessity of getting operational teams involved early so that they can better estimate the cost of operating a new technology.
另外,这一因素再次强调了使操作团队尽早参与进来的必要性,以便他们能够更好地估计新技术的操作成本。
If you manage your project from a good plan — and an integral part of that plan is a good estimate — there is going to be significant cost savings.
如果您采用一个好的计划管理您的项目——其中一个完整的部分就是一个好的评估——那么您将能够节省大量的开销。
A rough cost estimate for a solution.
对解决方案的粗略成本估算。
A timeron does not directly equate to any actual elapsed time, but gives a rough relative estimate of the resources (cost) required by the database manager.
timeron不直接等于真正的消耗时间,但是对数据库管理器所需的资源(成本)给出了一个相对粗略的估算。
The best estimate is that putting people on a spacecraft multiplies the cost ten-fold.
最保守的估计是载人飞船将增加10倍的费用。
The next point Reeves makes is about the cost of manufacturing, which generally isn't considered part of the engineering effort but is part of the overall cost estimate for a engineered artifact.
Reeves接下来的观点是关于制造成本的,制造成本通常不算工程的一部分,但是是工件的总体成本估计的一部分。
Mr Rauh and Mr Novy-Marx estimate that raising the retirement age by a year would trim the cost by 2-4%; a cut of a percentage point in inflation-linking would slash it by 9-11%.
Mr Rauh andMr Novy-Marx估计,提高一年退休年龄将是开销减少2%-4%,通货膨胀率下降一个百分点将使债务减少9%-11%。
The lower price is based on NASA's estimate of the cost for transporting a shuttle from Kennedy Space Center to a major airport, and for displaying it indoors in a climate-controlled building.
低廉的价格是建立在NASA的估价上的,这些估价包括把航天飞机从肯尼迪航天中心运输到一个主飞机场,还有将其展示在一个气候可控制的建筑中。
In this case, the optimizer USES a generic rule or a default value to estimate an average cost by assuming normal data distribution.
在这种情况下,优化器会使用一个通用规则或者默认值以正常数据分布率来评估得到一个平均开销值。
They estimate one square metre of glass will cost only a few cents to treat.
他们估计处理每平方米的玻璃只需要花费几美分。
As the staff member gains in-depth insight into the impact of the database field length increase, he can give a better cost estimate for this modification.
通过深入了解增加数据库字段长度的影响,可以更准确地估计这一修改的成本。
Suppose one of you wants to build a tower. Will he not first sit down and estimate the cost to see if he has enough money to complete it?
你们哪一个要盖一座楼,不先坐下算计花费,能盖成不能呢?
C. To get a better cost estimate.
为了得到一个较好的成本估算。
While SARS cost between $50 billion to $100 billion, a World Bank estimate has pinned the potential costs of a severe flu pandemic at $3 trillion.
非典疫情造成的经济损失达500-1000亿美元,而据世行测算,严重的流感大流行造成的潜在经济损失(en)将达30000亿美元。
The biggest banks in Italy and Spain generally estimate the cost of borrowing euros for a year at about 1.1%.
印度与西班牙两国最大的银行通常估算出的欧元一年期借款成本约为1.1%。
Realistically, a budget accounting item for contingency allowance should be established whenever a contingency amount was included in the final cost estimate.
在实际操作当中,无论详细的成本估算中是否包括了意外事件,项目预算都应列支一笔应急储备金。
Suppose that we wish to estimate the total cost to complete piping construction activities on a project.
假定欲估算某项目直线管道铺设工程的总成本。
With a degree that qualified him to estimate the cost of construction projects, he is also contacting construction companies in Canada.
他的专业使得他有资格估计建筑设施成本,同时他也和加拿大的建筑商联系。
Physicians according to patients condition, estimate the cost of treatment, patients for a free choice.
医生根据患者的病情,大概估计其治疗费用,方便患者进行自由选择。
This method can accurately predict the system contention state so that to estimate the cost of a query precisely.
该方法可以通过确定服务器工作状态来精确地预计系统的查询费用。
This paper describes the software project cost estimate model based on RUP. Based on the survey, a software project cost management system is designed and realized.
在对基于RUP的软件项目成本估算模型进行研究的基础上,本文设计并实现了基于RUP的软件项目成本管理系统。
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
应用推荐