• Low power was recorded with numbers 0 to 9; as power got higher, the computer used letters: 10 was A, 11 was B and so on.

    功率19来记录功率时,有A表示10B表示11,依此类推。

    youdao

  • So, I select the second column of B, and I take the first row of A, 0 and I find: 1 times 0: 0.

    所以B第二A第一然后我算:1*0

    youdao

  • The IntegrateInt process also writes the integer 0 (which is, after all, the current value of the running total) onto channel b.

    IntegrateInt进程整数0(当前汇总)写入通道b

    youdao

  • There it is X is 0, Y is 3. That's b.

    X0,y3b

    youdao

  • This causes the IntegrateInt process to change the running total to 0+1=1 and thereby write the integer 1 onto channel b.

    造成IntegrateInt 进程把汇总值修改 0+1=1,所以整数 1写入通道 b

    youdao

  • The Time on Page for page B is 0 seconds, because there is no subsequent timestamp that Google Analytics can use to calculate the actual Time on Page.

    时间网页B0因为没有后续时间戳分析认为谷歌可以使用计算实际时间页。

    youdao

  • Swept by Hartford 3-0, the Quinnipiac University volleyball team was knocked out of Group b.

    哈特福德大学以3比0横扫后奎尼匹克大学排球队B中淘汰。

    youdao

  • The positive rates of hepatitis B virus (HBV) replication markers in patients with HBVand HDV double infection were lower than the cases with only HBV infection (P<0. 05).

    乙肝肝炎病毒双重感染者其乙肝复制指标检出率显著低于单一乙肝感染者(P<0.05)。

    youdao

  • This paper also discusses some protection & monitor schemes based on CANbus network, which use CAN2 . 0 B protocol to su…

    同时介绍了应用支持点通信的CAN2 .0 B规约实现几种网络化保护控制方案的实例。

    youdao

  • Meanwhile, Juventus played out a 0-0 draw with fellow Serie B side Piacenza this evening.

    同时,在晚上进行一场比赛尤文乙级球队皮亚琴察队踢成了00平局

    youdao

  • Translate the intersection point B(0, b) to the origin. (M1)

    平移交点B0b坐标原点,写出平移矩阵M1。

    youdao

  • The corrosion survey for the complex unit during the turnaround finds out the minor corrosion in the primary distillation tower (metallurgy: Q235-B) with a coupon corrosion rate of 0.

    联合装置检修期间进行腐蚀调查表明:常压分馏系统的初(材质Q 2 35 - B)腐蚀较轻,挂片腐蚀0

    youdao

  • The RI, PI and A/B value are lower than normal control group(t<0. 005).

    PIA/B等三项指标均明显低于正常对照组(P<0.05)。

    youdao

  • The RI, PI and A/B value are lower than normal control group(t<0. 005).

    PIA/B等三项指标均明显低于正常对照组(P<0.05)。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定