结合龙羊峡具体工程,建立了健康综合诊断结构体系。
Taking Longyangxia as an actual example, a comprehensive health diagnosis structure system is established.
文章简述了编研工作的意义、特点以及龙羊峡水电厂开展档案编研工作的历程。
The paper briefly describes the compilation work's meaning, characteristic and the course of compilation work in Longyangxia Hydropower Station.
正在施工的龙羊峡水电站,1981年9月发生了有实测记录以来最大的一次洪水。
The Longyangxia hydropower project which in under construction encountered the heaviest flood on record in September, 1981.
通过龙羊峡水库合理运行方式研究,确定公伯峡水电站渡汛方案以及提高渡汛标准方案。
Through studying Longyangxia reservoir reasonable operation mode, Gongboxia hydro-power station's flood period scheme and improvement flood period standard scheme are established in this paper.
通过理论计算和实际现场试验所得的参数,制定出龙羊峡水电站发电机组的进相运行曲线图。
According to the parameter getting through the theories calculation and the actual field experiments, the paper makes phase operation graph of generator in Longyangxia Hydropower Station.
因龙羊峡电站在西北电网承担第一调频、调峰电站,其增容120MW的容量效益也是显著的。
Because the Longyangxia hydropower station is the first regulative frequency and climax station in north-west, the benefit is also prominence after increasing 120mw capacity.
介绍了龙羊峡水电站大坝安全监测项目的设置、监测系统改造的思路及过程、自动化监测系统的结构和功能特点等。
The design characters and operation status of the automatic monitoring system of upper-reservior of the Shisanling Pumped Storage Power Plant;
文章本着降低损耗,减小厂用电率的目的,分析了龙羊峡发电分公司厂用电率过高的原因及降低厂用电率的具体措施。
For the purpose of reducing exhaust and power consumption rate, the paper analyses the reason of over high power consumption rate and the concrete method of decreasing the power consumption rate.
文章本着降低损耗,减小厂用电率的目的,分析了龙羊峡发电分公司厂用电率过高的原因及降低厂用电率的具体措施。
For the purpose of reducing exhaust and power consumption rate, the paper analyses the reason of over high power consumption rate and the concrete method of decreasing the power consumption rate.