• 变压器垂直同变电室的其他低压配电同期进行吊装吊装方案进一步论证优化

    Vertical swinging of transformer and other high & low voltage switch boxes should be carried out simultaneously. Have further argument and optimization of hoisting plan before hoisting.

    youdao

  • 又是开关低压预装变电站必备的配套产品

    High voltage switchgear, and ring net frame, high and low voltage substation the necessary supporting preinstalled type products.

    youdao

  • 又是开关低压预装变电站必备的配套产品

    High voltage switchgear, and ring net frame, high and low voltage substation the necessary supporting preinstalled type products.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定