• 通过水利损失计算确定构筑物高程绘制高程布置和平布置提供了依据

    The loss of water through the calculation to determine the elevation of the structures for mapping elevation layout maps and graphic layout plan provided basis.

    youdao

  • 平面布置不宜呈突然扩大收缩状,堤顶高程宜与潮位一致

    In the plane layout of double dikes, the sudden expansion or contraction should be avoided. The elevation of the top of the dike should be identical with middle tide level.

    youdao

  • 其中初步设计完成设计说明书一份污水处理厂平面布置一张、高程一张,流程图一张,主要设备一张。

    And the preliminary design must complete design instruction booklet one, Sewage treatment plant total floor-plan, elevation chart, flow chart, main equipment drawing.

    youdao

  • 其中初步设计完成设计说明书一份污水处理厂平面布置一张、高程一张,流程图一张,主要设备一张。

    And the preliminary design must complete design instruction booklet one, Sewage treatment plant total floor-plan, elevation chart, flow chart, main equipment drawing.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定