以实际设计经验总结为基础,对钢筋混凝土高层建筑建筑基础和剪力墙的设计与构造提出了一些具有实用价值的处理措施。
Based on the experience of the practical design, some measures of design and construction of foundation and shear wall in high-rise building are put forward in this paper.
高层建筑工程的实测数据表明,该公式与实际吻合较好,因此在桩基础的设计中具有一定应用借鉴价值。
The measuring data of high building construction indicate that the calculating result is close to measuring result and useful in design of pole foundation as reference.
高层建筑火灾时期,通道烟流的温度变化规律是消防工程设计的基础。
During a high rise building fire, the rule of change in smoke temperature is the basis of fire engineering design.
介绍高层或超高层建筑施工在选择塔式起重机时的正确选用办法和自升式塔式起重机的基础设计方案选择。
This paper introduces correct selection methods and base design scheme of automatic tower derrick in high and super high building construction.
随着高层建筑的增多,在高层建筑基础工程的设计中引入考虑地基土的非线性性状的设计方式,已显得尤为重要。
With the increase of the amount of high-rise buildings, it is shown that introducing the soil nonlinear behavior into the foundation design is very important.
在此基础上,提出了高层建筑钢结构抗震设计第二阶段安全检验的弹塑性时程分析实用方法建议。
A practical procedure of elastoplastic time history analysis safety check during the second stage of the aseismic design for steel structure is also suggested.
介绍岩溶地区一高层建筑群采用天然地基上筏板基础设计的实践。
A practice of a group of highrise buildings with raft foundation in karst region was introduced.
本文阐明了设计人员应首先考虑利用高层建筑基础接地网作为接地装置。当不能利用基础接地网作为接地装置时,应该设计人工接地装置。
This text has expounded a designer should consider utilize the basic earth network of the skyscraper as the earth device at first, if not, should design the artificial earth device.
本文阐明了设计人员应首先考虑利用高层建筑基础接地网作为接地装置。当不能利用基础接地网作为接地装置时,应该设计人工接地装置。
This text has expounded a designer should consider utilize the basic earth network of the skyscraper as the earth device at first, if not, should design the artificial earth device.
应用推荐