对于Fenno - Skan2号线项目,ABB将负责系统工程工作,包括设计、供应和安装两个高压直流换流站。
For the Fenno-Skan 2 project, ABB will be responsible for system engineering, including design, supply and installation of the two HVDC converter stations.
另外宣布的是,ABB还被选中为两座换流站提供800千伏特高压直流变压器设备。
As separately announced, ABB has also been selected to supply the 800 kilovolt (kV) UHVDC transformers for both converter stations.
主要阐述了高压直流输换流站用直流滤波电容器的特点和设计参数的选择。
This paper introduced the characteristics and parameter selection of DC filter capacitor used in HVDC transmission system.
主要阐述了高压直流输换流站用直流滤波电容器的特点和设计参数的选择。
This paper introduced the characteristics and parameter selection of DC filter capacitor used in HVDC transmission system.
应用推荐