本论文研究的电气主接线综合评价系统,主要针对高压配电网中110KV变电站高压电气主接线的设计。
This paper presents a synthetic assessment system for main electric connection, especially for high-voltage main electric connection of 110KV substation.
分析高压电缆接线盒使用中存在的问题,并提出改进方法。
The text analyses existing problems of the connected box for high-pressure steel clad cable, and puts forward some improved methods.
接线绕组的超高压变压器应增设零序差动保护。
The zero-sequence differential protection ought to be added at the star winding of extra-high voltage transformer.
电气主接线是指发电厂、变电站、换流站中,为满足预定的功率传送和运行要求而设计的、表明高压电气设备之间相互连接关系的传送能量的电路。
The UHVDC converter substation is quite different from traditional ones, so it's necessary for carrying out specific research of main electrical scheme and equipment parameters.
电气主接线是指发电厂、变电站、换流站中,为满足预定的功率传送和运行要求而设计的、表明高压电气设备之间相互连接关系的传送能量的电路。
The UHVDC converter substation is quite different from traditional ones, so it's necessary for carrying out specific research of main electrical scheme and equipment parameters.
应用推荐