验收报告明天可以给你吗?
验收报告需在设备正常运作后由买方和卖方技师共同签署确认。
The final acceptance will be finished by the Buyer and above technical personnel once the contracted machines are running properly.
顾问费是按照顾问的实际工作天数进行支付,具体见活动验收报告。
The consultant charge is to be paid according to the actual work days, referring to the project final check up report.
供应商在收到散装托运零件后,必须在5日内向买方提供一份产品验收报告。
The vendor must provide a Receiving Inspection Report to the buyer within 5 days after receipt of the consigned component.
预验收合格后,双方签署预验收报告,预验收所需全部工检量具和材料全部由供方提供。
The two sides will sign a report of Pre-acceptance if it's finished positive. All of the measuring instrument and the materials needed for Pre-Acceptance must be provided by the supplier.
所有的验收报告、吊车厂家的安全公告和设备维修历史记录均应保存在有组织的文件系统中。
All inspections, crane manufacturer's safety bulletins and equipment repair history shall be kept in an organized file system.
通过总结阐明了编写建设项目环境保护竣工验收报告的几点体会,对开展建设项目环境保护有一定的指导作用。
Ideas on writing the checking and accepting report for construction projects are summarized based on practical work, which will help to guide environmental protection for construction projects.
通过总结阐明了编写建设项目环境保护竣工验收报告的几点体会,对开展建设项目环境保护有一定的指导作用。
Ideas on writing the checking and accepting report for construction projects are summarized based on practical work, which will help to guide environmental protection for construction projects.
应用推荐