• 岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。

    Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.

    youdao

  • 验收项目,有一个湿试验分组,用来加速评定外壳腐蚀性能相应质量可靠性能

    In acceptance tests, a moisture resistance test is used to evaluate the anticorrosion property of the package and its relevant quality reliability.

    youdao

  • 通过模型验收试验结果进行详细的分析,结果显示除部分工况压力脉动值外,模型转轮各项性能满足合同要求。

    The results of model test were analyzed. It is concluded that the performance of the model turbine is satisfying, with presspulsation on some operation point exception.

    youdao

  • 由于整体煤气化联合循环机组特点热力性能验收考核试验方法内容、所要采用试验标准不同于常规燃煤电厂。

    Considering the specialty of IGCC unit, the content and method of its acceptance test, the code used, are different from the conventional coal-fired plant.

    youdao

  • 由于整体煤气化联合循环机组特点热力性能验收考核试验方法内容、所要采用试验标准不同于常规燃煤电厂。

    Considering the specialty of IGCC unit, the content and method of its acceptance test, the code used, are different from the conventional coal-fired plant.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定