在你进入室验室实践以前,相当大量的工作在于设计一个合理的实验步骤。
A considerable amount of work goes into designing a rational set of experiments before you ever venture into the lab to perform them.
生产工艺是如何设计及验审的?
典型电路和ATE转接电路板卡的可靠性预计和分析,验证了本设计的工程实用性。
The practical values of the design are verified by the reliability predictions and analyses of a typical circuit and exchanging circuit card of the ATE designed.
供应商 先期参与的目的,是在运用供应商的专业知识以及经 验,来共同设计开发出符合可有效制造的产品规格。
The objective is to utilize the supplier's expertise and experience in developing a product specification that is designed for effective and efficient product roll-out.
抽样复验结果应符合现行国家产品标准和设计要求。
Complex sample testing results should be in line with existing national product standards and design requirements.
第十五条轨道交通工程竣工后,轨道交通项目建设单位应当按照设计标准组织工程初验。
Article 15 Upon the completion of CRC engineering, the CRC project construction unit shall, according to the design standard, organize the preliminary testing of the engineering.
Y341 114型自验封封隔器采用了坐封机构和验封机构一体化设计,实现了封隔器坐封与验封同步完成;
Y341-114 self-sealing examination packer adopts integral design of setting and self-sealing examination mechanism, which achieves the simultaneous completion of setting and self-sealing examination.
胶印机印刷质量很大程度上取决于其输墨系统的性能,采用计算机仿真,可以为输墨系统的设计提供一个预验的平台。
The quality of the offset printing depends on the performance of inking system. Using computer simulation can supply a pre-test platform for the inking system design.
设计了一个先验密度惩罚图像当中分水线变换后的相似的区域,图像分割进而变成对目标子集的最大后验估计。
The segmentation problem is the maximizing a posteriori estimation of the set of object area result from the watershed labeled.
投影系统的设计,可用验 证这些功能如何让光学工程师能几乎毫无隔阂的在同的分析模式下使用。
The design of a projection system was used to demonstrate how these capabilities allow an optical designer to move almost seamlessly between the different modes of analysis.
对此,一方面采用三参数流量计代替上压力计,另一方面设计了泄流式验封密封段。
Therefore a 3-parameter flow meter is used to replace the upper pressure meter, on the other hand, a seal section isd.
对此,一方面采用三参数流量计代替上压力计,另一方面设计了泄流式验封密封段。
Therefore a 3-parameter flow meter is used to replace the upper pressure meter, on the other hand, a seal section isd.
应用推荐