然后从组织集成、信息集成、风险集成三个方面来进行集成管理研究。
The research is put up from organization integration, information integration and risk integration.
在分析了工程项目风险的基础上,提出了工程项目全寿命周期风险集成化管理。
Based on analysis the risk of project, life cycle integrated risk management of project was given.
因此,ESB的每个特征都对其稳健性进行了增强,可尽可能减少集成或联合解决方案失败的风险。
So every characteristic of an ESB tends to strengthen its robustness, minimizing the risk of failure of the integrated and federated solution.
该项目组设法归结一个集成的方法和过程到可以极大地降低失败风险的程度。
The project teams have managed to boil an integration methodology and process down to a degree that greatly reduces risk of failure.
集成的治理、风险管理及法规遵从平台提供了处理企业事务的新方式。
Integrated governance, risk management and compliance platforms present a new way to handle these business processes.
这些集成帮助减少与软件开发相关联的风险,并且令应用程序开发更可预测。
These integrations help reduce the risk associated with software development and make application development more predictable.
开发人员如果不协作,您就会增加集成失败的风险。
Without developer collaboration, you increase the risk that integrations will fail.
三个传感器已经交付并集成到NPP上,为减低风险而额外进行的测试将一直进行到剩余的两个传感器交付时为止。
Three sensors have been delivered for integration onto NPP, and additional testing is being performed to reduce risk until the remaining two sensors are delivered.
对于那些高度依赖于IBMNAS或与IBM NAS紧密集成的业务解决方案,不备份ibm NAS数据可能会导致巨大的业务风险。
Failing to back up the IBM NAS data for those business solutions that are highly dependent on or tightly integrated with IBM NAS may pose a high business risk.
最好是将持续集成认为是一种意识思维和描述,使你通过频繁地集成增量的软件开发变更以减少风险。
It is best to think of continuous integration as a mindset or statement of intent that allows you to reduce risk by frequently integrating incremental software development changes.
其他的风险可能包括专业技能不足,对技术不熟悉,以及未能平滑地与已有的产品和设备集成。
Other risks may include not having the right level of expertise, unfamiliarity with the technology, and problems integrating smoothly with existing products or equipment.
敏感数据也可能要求一定的机密性(即加密),我们必须要清楚何时将它们与其他资源集成在一起,而不会带来风险。
Sensitive data is also likely to require confidentiality (that is, encryption), and you must take care when you mash it with other sources to not put it at risk.
这种相辅相成、积极的风险观是TOGAF -SABSA集成的根本基础。
This complementary positive view on risk is an essential basis for the TOGAF-SABSA integration.
一个集成的软件开发平台和一致的,结构化的过程以及良好的实践对减小风险和成本,确定大型项目的时间进度都是至关重要的。
An integrated software development platform and consistent, configurable processes and best practices are essential to mitigate risk to cost and schedule across these large projects.
跨越多个孤立单元和功能模块的集成风险管理系统会有更大的发展前景。
Integrating risk management systems across once-divided units and functions is essential to seeing the bigger picture.
提前了解数据质量有助于更准确地确定数据集成项目的规模,降低项目风险。
Understanding data quality upfront enables a more accurate sizing of data integration projects thus reducing project risks. The key features are.
ClearQuest不是一个便宜的工具,而且它对风险管理不是独一无二的成本有效的工具。然而,它同时还可以集中的管理我们的集成和测试方面的问题。
ClearQuest isn't a cheap tool, and it wouldn't be cost-effective for risk management alone; however, it would also be central to managing our integration and test issues.
与跨越整个软件开发生命周期的应用程序进行集成,减少风险的同时增加了可预测性。
Integration with a suite of applications that cover the entire software development lifecycle, reducing risks and increasing predictability.
他们从一家10000人的公司一下子变成20000人,几乎翻了一倍;IT部门也翻了一倍,很多集成项目和风险需要管理。
They had gone from a 10,000 to a 20,000 person company, approximately doubled in size; IT had also doubled in size and there was a massive amount of integration work and the risk needed to be managed.
RationalDataArchitect集成了跨整个软件开发周期的各种应用程序,有了它,就可以降低风险,增加可预测性。
With Rational Data Architect, you have a tool fully integrated with a suite of applications that cover the entire software development lifecycle, reducing risks, and increasing predictability.
IBMRationalRequisitePro是一个强大、易用、集成的需求和用例管理产品,它能够促进更好的沟通、提高团队协作、降低项目风险。
IBM Rational RequisitePro is a powerful, easy-to-use, integrated product for requirements and use-case management that promotes better communication, enhances teamwork, and reduces project risk.
第二大的风险区域就是在开发过程中的早期不去确定假定条件(这可能在系统进行集成测试时被证明是无效的,导致重大的返工)。
A second major risk area is not validating assumptions early in the development process (which may prove to be invalid when the system is in integration testing, leading to significant rework).
通过集成可复用资产来应对风险(满足服务水平协议(SLAs),解决方案复杂性等)。
Address risks with integrating with a reusable asset (meeting service level agreements (SLAs), solution complexity, etc.)
你将如何并在什么时候集成和演示你的系统依靠于你的客户、项目规模和项目风险。
How and when you integrate and demonstrate your system depends on your customer, project size, and project risks.
测试将存在于一个带有多个功能点(高集成度点)的代码区域,该区域被多个开发者所使用(高风险)。
The test will reside in a code area with multiple function points (high integration point) and in which more than one developer touches the same code (high risk).
这包括了从带有集成点的领域到带有若干个与之有矛盾的缺陷的领域(高风险)。
This includes areas that have integration points to areas that have several defects logged against them (high risk).
这样做从开发速度上说感觉好像不错,但却只是一个幻象;因为它将有风险和消耗实践的编码工作推到了最后——包括合并、集成与测试等工作。
It gives a nice feeling of speed but can be an illusion since it pushes the risky and time consuming bits to the end - merging and integrating and testing.
配合PTD项目经理开展项目集成工作,如预算、规划、目标设定、风险分析、技术研究等。
Support PTD project manager for project integration work, such as budgeting, planning, target setting, risk analysis, technical study, etc.
身临其境的“人地”与小游戏集成套件网站,以促进他们传奇的棋盘游戏,孩之宝推出新的风险。
An immersive "Man Land" website with integrated suite of mini-games to promote the new Hasbro release of their legendary board game, RISK.
风险管理计划,可以集成到其他组织计划,如战略计划。
The risk management plan can be integrated into other organizational plans, such as a strategic plan.