在公路工程项目风险评价中,本文基于模糊效用风险度量法提出了模糊效用风险评价法。
In the part of road engineering project risk evaluation, this paper puts forward the method of fuzzy and utility risk evaluation based on the method of fuzzy and utility risk measurement.
采用模糊评价法对工程承包风险进行评价,能较好地解决对工程承包风险中各种模糊性因素的度量。
The method of fuzzy evaluation is used to evaluate the project risks in order to solve the extent of fuzzy factors of contracting risks.
通过指数法和人工神经网络方法的联合应用,相互比较得到科学、准确的风险评价结果。
Through the union application of the index method and artificial neural network method, relatively received science, accurate result of appraisal of risk each other.
风险评价是风险管理的重要阶段,针对农产品加工企业特点,提出了一种基于模糊层次分析法的农产品加工企业风险评价方法。
Risk evaluation is one of the most stages of risk management. This paper put forward a new method for agricultural products making enterprise on the base of fuzzy-AHP.
运用美国道化学公司火灾、 爆炸危险指数法对环氧乙烷生产工艺过程进行风险评价,提出了改善安全生产环境的具体措施。
Risk assessment is carried out for EO process using Dow F&E index method. Then, some detail measures are offered to improve the safety production.
采用特尔菲法,选择4个一级因子和14个二级因子,建立洪灾风险评价等级指标体系。
The flood risk assessment grading systems composed of 4 first-grade factors and 14 second-grade factors are established based on Delphi method.
本文设计了类似于德尔菲法的专家调查法,识别出投标商风险控制能力评价指标,构造了指标结构系统。
The paper designs an expert inquiry similar to Delphi method, and identifies and classifies the indexes in tender evaluation based on the ability of tender to control engineering risk.
按照安全系统工程法,建立了电泵系统的安全可靠度以及系统风险评价的量化公式。
The safety reliability and system risk estimation formula of electric pumping system are established by means of the safety systematic engineering method.
经项目风险评价的实例验证,用改进的层次分析法对工程项目风险进行评价,是简便可行的。
It is proved by example that it is convenient and feasible to use the improved analytical hierarchy process in evaluating risk of construction projects.
以巢湖流域为研究区,尝试采用改进的磷指数法在较大的流域尺度开展非点源磷流失风险评价及关键源区识别。
A modified version of P index was used to assess P loss risk and identify critical source areas in Chaohu watershed at a regional scale.
运用概率统计法对不同生产方案、不同污染源强及不同环境功能区的污染风险进行了综合评价研究。
By applying probability statistics, a comprehensive evaluation has been made on the pollution risk for different production, pollution sources and environmental function areas.
本文应用风险分析方法中的事故树分析法,对矿山斜井轨道运输跑车事故发生的原因进行分析,并在此基础上进行风险评价。
By applying the principle of the Fault Tree Analysis, the present paper has analyzed direct and in direct causes of mining accidents and made the corresponding assessments on the mining risks.
通过模型在工程实践中的应用,验证了模糊综合评价法在风险评价中的有效性和可操作性。
The validity and practicability of the risks assessment of expressway concessionary project was verified after the model had been applied to the practice of a project.
用故障树分析法、风险排序法、专家评分法进行管道风险评价。
Fault Tree Analysis, Riska Sorting, Experts Scores Technique are used in the Pipeline Risk Assessment.
同时用条理分析法连接工程实例构建了风险评价目标体系,并对指标权重要水平做了分析。
While using ahp combined with engineering examples, constructs the risk evaluation index system, and the important indexes weight are analyzed.
通过构建风险评价指标体系,再利用风险矩阵分析法对这些风险事件的重要性进行评价和排序,能为风险控制提供依据。
By constructing the risk evaluation system and exploiting risk matrix analysis, we can evaluate and sort risk events and thus provide effective outsourcing risk control.
运用层次权重分析法对贷款类资产风险指标体系进行综合评价,为判断银行货款类资产质量和风险评价提供了依据。
The AHP method was utilized to evaluate this asset risk index system, which provided references for Banks to determine the asset quality for loans.
采用模糊综合评价法对供应链风险进行评估,并给出了模型的应用。
Used the fuzzy comprehensive evaluation method to evaluate supply chain risk, and has given the model application.
最后,通过实际IT项目评价数据的验证,该风险评价模型能够准确地按照专家评价法进行工作。
Finally, the risk assessment model is capable to simulate expert assessment method by verifying the data of IT projects assessment.
研究在风险评价中应用GO法进行含有共因失效的系统可靠性定量分析方法。
A quantitative analysis method was developed to analyze system reliability with common cause failures by the GO methodology for probability risk assessment.
目前,国内所运用的风险评价方法主要有专家打分法、模糊综合评判法和层次分析法。
Now, the main estimate methods of risk in our country include the Experts Mark, Fuzzy Integrated Estimation and Analytical Hierarchy Process (AHP).
以国际通行的打分法为基础,采用层次分析(ahp)法对风险要素的权重进行了调整,建立了相应的评价矩阵。
According to the universal scoring method, adjust the weighting of the factors by AHP method and set up an assessment matrix.
本文利用可拓学和层次分析法的基本原理,提出了一种定量与定性相结合的城市区域火灾综合风险评价方法。
The paper discusses the Evaluation of City Regional Fire Risk, and puts forward a qualitative and quantitative evaluation method based on extension theory and AHP.
探讨了净现值(npv)法在风险投资项目评价中应用的机理,并具体分析了NPV法运用的方法、步骤,最后给出该方法应用的实际案例。
Application mechanism of Net Present Value (NPV) method in venture capital project appraisal is discussed, application procedure for NPV is analyzed, and concrete application case is also illustrated.
详细阐述了指数评价法和模糊综合评审在城市燃气管网风险评价中的应用过程。
The application process that index risk assessment and the fuzzy comprehensive assessment method are applied to safe management of city gas pipeline is given.
建立了评价指标体系,构造了一个基于层次分析法与模糊数学基础上的风险应对方案模糊评价模型。
In the part of risk answer, I spend plentyful energy in find the answer to the risk , found assessment index, construct a fuzzy evalution mode based on AHP and fuzzy maths.
利用模糊综合评价法对企业资信等级进行定量分析,并提出了商业信贷风险跟踪预警监测的方法。
Using fuzzy comprehensive evaluation to analyse the grade of enterprise credit in fixed quantity, and raising the tracing forewarning control testing method of commercial credit risks.
针对电子商务中存在的经济安全和风险,可将工业安全检查表法应用于电子商务中以评价电子商务平台的安全性。
In the light of the economic security and risks existing in e-commerce, the industrial safety checklist can be used in thee-commerce for estimating the security of e-commerce platform.
从而应用指标因素法,建立了基于风险投资项目评审决策的项目风险评价指标体系。
In the case of applying the method of the index factor, a venture capital project risk evaluation index system is set up on the basis of project appraising and decision-making.
采用作业条件危险性评价法对炼油厂的原油罐和火炬进行了风险分析,根据分析结果,提出了整改措施,以保证炼油厂生产的安全。
The crude oil tank and flare system was assessed by using of LEC. Based on the assessment result, rectifying measures were proposed, to guarantee production safety of refinery.
应用推荐