• 30 %额定功率运行所作全厂试验表明,五个控制系统基本上达到电厂运行要求

    The performance of those control system during plant transient testing at 30 % of full power reach the requirement of the plant normal operation.

    youdao

  • 通过放纸辊电机运行特点分析说明选择电机额定功率时,关键计算电机的最大负载电流

    Based on the analysis of operation characteristics of the unwind motor, we proved that the calculation of the motor's maximum current is the key for selecting the motor rated power.

    youdao

  • 数字仿真表明,在风速低于额定风速时变速运行捕获能量比恒速运行捕获能量大;调节控制可以很好地使输出功率稳定在额定功率左右

    The simulation results indicate that wind turbine is operated at maximum power coefficient with variable-speed mode and the output power of generator is kept around rated power with pitch control.

    youdao

  • 额定功率变动负载功率情况下,机组连续运行12小时允许1小时超载10%。

    Rated power: changes in the power load, the continuous operation of generating units, each 12 hours to allow 1 hour overloading 10%

    youdao

  • 额定功率变动负载功率情况下,机组连续运行12小时允许1小时超载10%。

    Rated power: changes in the power load, the continuous operation of generating units, each 12 hours to allow 1 hour overloading 10%