工程采用的在人字门顶枢A、B拉架预留槽内预埋预应力锚杆的设计方案,在国内尚属首例。
The design scheme of installing pre-stressed anchorage rod in the channels of A and B tension bar in the top pintle of miter gate has been adopted, which is the first one at home.
工程采用的在人字门顶枢A、B拉架预留槽内预埋预应力锚杆的设计方案,在国内尚属首例。
The design scheme of installing pre-stressed anchorage rod in the channels of A and B tension bar in the top pintle of miter gate has been adopted, which is the first one at home.
应用推荐