采用某矿区实测资料对模型进行验证,预计结果最大相对误差9%,可以满足矿山开采沉陷预测的要求。
The measured data of the mining area are used to verify the model with the expected results of the maximum relative error 9%, which can meet the requirements of mining subsidence.
采用某矿区实测资料对模型进行验证,预计结果最大相对误差9%,可以满足矿山开采沉陷预测的要求。
The measured data of the mining area are used to verify the model with the expected results of the maximum relative error 9%, which can meet the requirements of mining subsidence.
应用推荐