• 采用矿区实测资料模型进行验证预计结果最大相对误差9%,可以满足矿山开采沉陷预测要求

    The measured data of the mining area are used to verify the model with the expected results of the maximum relative error 9%, which can meet the requirements of mining subsidence.

    youdao

  • 采用矿区实测资料模型进行验证预计结果最大相对误差9%,可以满足矿山开采沉陷预测要求

    The measured data of the mining area are used to verify the model with the expected results of the maximum relative error 9%, which can meet the requirements of mining subsidence.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定