• 这些成本预测方法通过分析或者模拟形式,Palladio模型(PCM实例)中计算出标准结果(例如反应时间)。

    The approaches, by means of analyse or simulation, calculate metrics (e.g. response time) from Palladio models (instance of the PCM).

    youdao

  • 然后根据预测结果制定出该物流企业的标准物流成本利用标准成本成本进行控制

    Finally the standard cost is set down according to the forecast result and control the cost with the standard cost.

    youdao

  • 然后分析三个因素增量成本影响,并根据2014新版中国绿色建筑标准对绿色建筑增量成本变化趋势进行预测

    Last, analyzes the influence of three factors on the incremental cost, predicts the incremental cost of green buildings according to the new issued 2014 Chinese green building standard.

    youdao

  • 然后分析三个因素增量成本影响,并根据2014新版中国绿色建筑标准对绿色建筑增量成本变化趋势进行预测

    Last, analyzes the influence of three factors on the incremental cost, predicts the incremental cost of green buildings according to the new issued 2014 Chinese green building standard.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定