据此设计并采取了预应力长锚索、混凝土挡墙及防排水等综合加固措施。
Accordingly, the reinforcement measures, such as long pre-stressed cable bolting, concrete stopping wall and water control, are taken.
据此设计并采取了预应力长锚索、混凝土挡墙及防排水等综合加固措施。
Accordingly, the reinforcement measures, such as long pre-stressed cable bolting, concrete stopping wall and water control, are taken.
应用推荐