• 据此设计采取了预应力锚索混凝土挡墙防排水综合加固措施

    Accordingly, the reinforcement measures, such as long pre-stressed cable bolting, concrete stopping wall and water control, are taken.

    youdao

  • 据此设计采取了预应力锚索混凝土挡墙防排水综合加固措施

    Accordingly, the reinforcement measures, such as long pre-stressed cable bolting, concrete stopping wall and water control, are taken.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定