• 由于预制预制箱梁搬运重量很大,而预制场地基属于土地所以变形上要求严格

    The deformation of pre-site base is so strict because pre-Box games and handling machine is very heavy in precast yard and the pre-site base is soft.

    youdao

  • 使用产品缩短工期提高产量提高模板场地周转率尤其适用冬季预制场和农村建房

    Using this product can shorten the construction period, increase production, improve templates and site turnaround, especially suitable for winter prefabricated plant and rural construction.

    youdao

  • 为了研究碎石复合地基场地沉入预制桩的可能性进行预制桩沉桩试验

    Precast pile driving test is performed to investigate its possibility in gravel pile composite foundation with settling tube.

    youdao

  • 现场预制附近的场地预制互相协作都会现场需要提供合乎要求的预制件。

    Proper co-ordination between the site and the adjoining unit-producing yard will provide units, as and when required, on the spot .

    youdao

  • 可以预制工厂场地批量预制然后运输现场安装即可

    It can be bulk prefabricated in the factory and transported to the site to install.

    youdao

  • 在厂家生产好的预制模块房运到场地进行吊装每个单体集装箱模块房大概需要小时时间,集装箱模块房之间对接处进行防水橡胶安装最后进行楼梯室内安装。

    Each container needs about half an hour to be lifted. Then install waterproof rubber at the joint between containers. In the last, install the stairs and indoor doors.

    youdao

  • 在厂家生产好的预制模块房运到场地进行吊装每个单体集装箱模块房大概需要小时时间,集装箱模块房之间对接处进行防水橡胶安装最后进行楼梯室内安装。

    Each container needs about half an hour to be lifted. Then install waterproof rubber at the joint between containers. In the last, install the stairs and indoor doors.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定