在进行案例分析时,本文原用了在我国已发生的二十个真是的风险投资案例,从实际出发,和本文的理论研究相结合,证明了本文的风险投资项目选择方法的适用性。
When analyzing the cases in the paper, I adopted twenty actual cases happened in our country and proved the applicability of the new method brought out in my paper.
维护自己的现有方法分类,随着时间的推移,可以通过为新项目选择最高效的方法来优化开发工作效率。
Maintaining your own classifications for existing methods to optimize development productivity over time by choosing the most efficient method for new projects.
您将会了解几种集成方法(包括这里描述的这几种)各自的优缺点,从而帮助您为您的项目选择正确的方法。
Included with each approach described here, you see the pros and cons to help you select the right approach for your project.
该方法由模糊综合评价系统和项目选择的模糊整数规划模型两部分组成。
The method consists of two procedures:fuzzy multicriteria synthetic evaluation and fuzzy integer programming.
论述了该方法应用于项目选择的基本过程,得出了项目选择的一种综合模型。
The basic process in which the method is used for the project selection is described and a synthetic model for project selection is obtained.
只有在选择列表支持多重选择时,才能使用该方法用于多项目选择。
Use this method for selection of multiple items only if select list is supporting multiple selection.
在项目选择过程中正确运用6Sigma工具和方法。
Employ the Six Sigma tools and methodology during the project-selection process.
在项目选择过程中正确运用6Sigma工具和方法。
Employ the Six Sigma tools and methodology during the project-selection process.
应用推荐