负责新产品过程开发,满足客户项目进度要求。
Be responsible for process design to meet the requirements of customer project.
该项目按进度要求在2011年完成。
当新人被要求加速项目进度时,在人员上的急剧增加能够减慢项目的进度。
Sharp increases in staff can slow project progress as new people are brought up to speed.
获奖者们将被要求一年提交两次对项目里程碑进度和奖金是使用情况进行详述的报告。
Winners will be required to submit a report twice a year which details progress made toward Project milestones and how the award funds are being used.
尽管项目会出现一些不确定的要求或者其它的不确定因素,但是客户依然想控制项目的进度。
Despite uncertainty with requirements and other aspects of the project, some clients wanted a tightly controlled project plan.
他对产品的要求是符合公司总体的业务策略,他还对该系统提出了一个远景概述,7每周五他还是公司项目进度检查组的一员。
He has the vision for the product as it fits into the company's overall business strategy, and he provides a vision statement for the system 7 and is part of the company's review team every Friday.
根据批准的变更控制与更新范围、费用、预算进度和质量要求,协调整个项目的变更。
Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.
准备和提交项目相关文件,即,生产进度表,以证明符合客户的交货时间表的要求。
Preparation and submission of project related documents i. e. production schedules to demonstrate that clients delivery schedules are being achieved.
根据项目进度实施试验,根据客户要求使用不同的仪器设备完成测试。
Perform testing according to project schedule, use different equipments and devices to achieve testing according to different client requirements.
管理整个工程团队、相关设计与施工过程控制;确保项目按质量、安全、费用与进度的要求完成。
Handle a whole team of engineering and the whole design and construction process; ensure new project complies with requirements of quality products, safety, cost and schedule.
这样对项目的成本、进度、资源控制提出了更高的要求。
So the cost of the project, progress, control of resources has put forward higher requirements.
在项目执行过程中,根据要求,承包商要向业主提供所有相关的计划与进度资料。
Upon request, Contractor will provide the Owner with access to all relevant planning and scheduling documents throughout the duration of the project.
这是分析活动顺序、持续时间、资源要求,以及进度制约因素和制定项目进度表所必需的过程。
This is the process necessary for analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
各方己根据修改后的初步设计的要求就第8.6条(项目进度表和延误后果)规定的标志日期达成一致。
The parties have reached an agreement on the flag date defined in article 8.6 (Project Schedule and consequences of delay). according to the requirements of the revised preliminary design.
在新的市场形势下,对工程项目建设的出成本、进度、控制提出了更高的要求。
The new market situation brings forward a higher demand for the cost, schedule and control of the construction project.
这就要求企业必须对施工项目进行规范、科学地管理,特别是加强对工程质量、进度、成本、安全的管理控制。
This request enterprise must carry on the standard to the construction item, manage scientifically, specially strengthens to the project quality, the progress, the cost, the safe supervisory control.
本程序是对CHRP-PC-PP-0001对承包商项目控制要求程序中的计划与进度作进一步定义及补充。
This procedure further defines and supplements the Planning and Scheduling requirements found in Procedure No. CHRP-PC-PP-0001, Project Controls Requirements for Contractors.
制订进度过程要求对历时估算和资源估算进行评审和修订,从而产生一个经过认可的项目进度作为对项目进展进行追踪的基准。
Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.
按要求提供项目实施计划书、项目任务分解表、时间进度表、预算分解表、自我监测计划;
Provide project implementation plan, project task breakdown sheet, schedule, budget breakdown table, self-monitoring plan;
按要求提供项目实施计划书、项目任务分解表、时间进度表、预算分解表、自我监测计划;
Provide project implementation plan, project task breakdown sheet, schedule, budget breakdown table, self-monitoring plan;