• 重点分析了运用赢得评估原理实现工程项目进度控制方法

    Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.

    youdao

  • WAPI项目进度控制基于关键管理进度控制核心缓冲管理控制

    The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.

    youdao

  • 摘要根据建设项目进度控制功能需求,提出基于BIM进度控制平台构架以及实施流程

    Abstract: According to functions of progress control, proposes the structure and implementation process of progress management platform based on BIM.

    youdao

  • 最后前面研究结果基础上,运用项目进度控制理论,提出进度控制具体方案保障措施

    Finally, in the previous research foundation, this paper has put forward specific schedule control programs and measures in use of the schedule control methods and tools.

    youdao

  • 阐述当前国际通用赢得评估原理以及如何赢得值项目进度控制费用控制有机地联系起来

    Present international conventional "earned value evaluation principle" as well as how to combine the earned value with project schedule control and cost control organically were also expounded.

    youdao

  • 进度控制方面设计项目进度控制程序,利用PROJECT工具进行了计划提出进度控制步骤

    In the progress controlling aspect, it designs the procedure of project progress controlling, planning with project tool and advances the steps of progress controlling.

    youdao

  • 然后讨论项目进度控制一般过程包括准备行动程序、过程监测控制以及最后项目评估三个阶段并对进行分析。

    Then it also discusses the general process of schedule control, which including three steps, action preparing, process monitoring and controlling, project results evaluation.

    youdao

  • 本文首先介绍的概况,在此基础上分析了项目工程特点施工难点,指出项目进度控制是实施该项目关键部分

    At first, this paper introduced the overview of the project, and then analyzed its characteristics, importance and difference, and pointed out it 's the most crucial part to control the progress.

    youdao

  • 使用它们可以方便地对账、设置每个月的预算评估控制项目进度

    They're handy for balancing a checkbook, setting up a monthly budget, and estimating and controlling project schedules.

    youdao

  • 质量活动必须使成本进度处于项目控制之下,满足CMM精神

    Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.

    youdao

  • 缺陷位置确定在Clearcase后,这个项目经理或者缺陷管理人员就可以Clearcase运行报告进度缺陷状况发布进行控制

    After the defect fix has been checked into Clearcase, the project manager or defect manager can run reports in Clearquest to monitor the progress and status of defects and issues.

    youdao

  • 尽管项目会出现一些确定要求或者其它不确定因素,但是客户依然控制项目进度

    Despite uncertainty with requirements and other aspects of the project, some clients wanted a tightly controlled project plan.

    youdao

  • 根据批准变更控制更新范围费用预算进度质量要求协调整个项目变更。

    Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.

    youdao

  • 负责项目成本进度控制

    Responsible for project cost and schedule control.

    youdao

  • 这些问题将会使软件项目质量进度成本等方面失去控制最终导致失败。

    These problems could make the software project lose control on quality, plan and cost and make bad result at last.

    youdao

  • 同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解

    Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.

    youdao

  • 关键路径进度识别控制项目故障后果,关键设计结构矩阵连接关键链。

    Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking.

    youdao

  • 项目实施制定具体施工方案项目执行过程中安装进度计划进行调整控制

    When the implementation of the programme and formulate specific construction project on the installation progress plan and to make an adjustment, control.

    youdao

  • 参与部分项目项目管理工作,把项目进度控制项目成本降低项目风险

    Prepare project management for some project, control project schedule, control project cost and down project risk.

    youdao

  • 进度控制项目管理一个主要内容

    Progress control is a major content of project management.

    youdao

  • 对于进度控制可以项目活动实际进度项目的计划进度进行比较监督项目进度实施。

    For schedules, progress on individual activities can be compared with the project schedule to monitor the progress of activities.

    youdao

  • 进度控制——控制项目进度变更

    Schedule control-controlling changes to the project schedule.

    youdao

  • 基础上提出航空型号研制项目管理进度控制模型

    On the basis of that, the aviation model development project management schedule control framework was proposed.

    youdao

  • 文中现代办公环境下项目管理设计进度控制工作提出一些想法,供商榷。

    The paper puts forward some ideas on project management and design schedule control in modern office environment.

    youdao

  • 项目快速跟进目标提高生产效率减少项目历时提高进度跟踪控制降低项目风险。

    The objective of fast tracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.

    youdao

  • 控制项目进度变更需要过程

    This is the process necessary for controlling changes to the project schedule.

    youdao

  • 进度成本质量工程项目管理控制目标

    Time, cost and quality are the most important control objects of project management.

    youdao

  • 本文针对航空产品特点项目运行过程进度控制技术进行研究

    Based on the characteristics of Aviation products, this paper mainly focus on the research of schedule control technology in the process of project running.

    youdao

  • 本文针对航空产品特点项目运行过程进度控制技术进行研究

    Based on the characteristics of Aviation products, this paper mainly focus on the research of schedule control technology in the process of project running.