资源约束项目调度问题是项目进度管理中的典型问题。
Resource-constrained project scheduling problem is a typical issue in project scheduling management.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
研究了员工具有异质效率、最小化项目工期的项目调度问题,并建立了相应的整数线性规划模型。
Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered, and the corresponding integer linear programming is presented.
计算结果显示了两种蚁群算法在求解多目标资源受限项目调度问题时的优势和对该类问题的适应性,同时也暴露了它们的一些缺陷。
The effectiveness and efficiency of these two algorithms are tested by comparing the results of solving Patterson's 110 problems with some priority based heuristics.
资源平衡优化问题即资源有限项目调度问题,是一个NP难问题,现在商用项目管理软件系统中的资源平衡优化问题多采用基于优先规则的启发式算法。
The resource-constrained project scheduling problem (RCPSP) is NP problem, most of commercial project management software usually employ simple priority rules for solving the problem.
幸运的是,类似LinSched(用户空间Linux调度器模拟器)的项目可以帮助您解决此问题。
Luckily, projects like LinSched (the User-space Linux Scheduler Simulator) can help solve this problem.
产品开发和生产是制造型企业运营的两个关键环节,产品开发项目调度和车间调度问题是这两个关键环节中的核心问题。
Production development and manufacturing are playing important parts in this process, and the problems of production development project scheduling and shop scheduling are the kernel of them.
在资源受限的项目调度过程中存在着资源冲突问题,严重影响着项目活动的执行。
There is resources conflict problem in the process of resource-constrained project scheduling, which seriously affects the execution of project activity.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
本文以实际开发的自动化立体仓库项目为依托,针对自动化立体仓库调度中的一些问题开展了相应的研究工作,提出了一种合理的立体仓库调度策略。
The thesis does some research work on several problems related to scheduling of automated storage (SAS) and presents an efficient strategy on SAS based on the real SAS project.
本文以实际开发的自动化立体仓库项目为依托,针对自动化立体仓库调度中的一些问题开展了相应的研究工作,提出了一种合理的立体仓库调度策略。
The thesis does some research work on several problems related to scheduling of automated storage (SAS) and presents an efficient strategy on SAS based on the real SAS project.
应用推荐