引进了项目评估法,在对不同开发方案进行比较时,将环境因素纳入其中。
Introduced project appraisal method which allows incorporation of environmental externalities when comparing development alternatives;
本质上,全面准确地对项目或任务进行预测和评估,要求采用科学管理中的Tayloristic方法,而这一方法仅适用于琐碎的,机械的任务。
In essence, fully accurate prediction and estimation of projects or tasks demand a Tayloristic approach of Scientific Management, which only is applicable to trivial, mechanical tasks.
传统NPV项目价值评估方法(净现值法)需要利用实物期权方法进行修正。
Traditional project valuation method NPV needs to be corrected by Real Option method.
首先,本文运用工作负荷点系统的评估系统、项目分解结构以及关键路线法构建了基于工作负荷点系统的进度度量监控体系。
First of all, the paper USES work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the work Load Point system.
实证分析的结果表明,当前用收益法评估广州市住宅项目时,可参考8.01%作为资本化率。
The analysis indicates that a capitalization rate of 8.01% can be taken for reference when evaluating housing projects in Guangzhou.
除此之外,还着重研究了将AHP和专家评价法结合起来对移动通信工程项目进行风险评估,并给出了应用实例。
In addition, the application of combination of AHP and Expert Evaluation Method in the risk assessment of mobile communication engineering projects is studied here, and a demonstration is also given.
项目评估的方法众多,主要包括三类:定性分析法、定量分析法以及定性-定量综合分析法。
There are numerous approaches in project assessment, including three main types: qualitative analysis, quantitative analytic approaches and qualitative-quantitative combined analysis.
比较这两种方法,灰色统计评估法比模糊层次评价法更客观可靠,是一种比较理想的项目方案优化方法。
Grey statistics method is more objective and reliable comparing with fuzzy hierarchy estimation, thus it is an ideal method for optimization of project schemes.
第二,在项目招投标阶段采用灰局势决策综合评估法合理选择施工单位;
Second:to adopt comprehensive evaluation of grey decision making choosing construction unit in bidding stage.
在此基础上,运用模糊综合评判法,利用数学模型对风险进行量化评估,从而对船舶保函授信项目风险进行风险的综合评价;
On the basis of this analysis, this essay employs mathematics model to make quantitative evaluation of risks so as to give overall risk appraisal for ship-building guarantee;
最后,利用加权平均法得出经专家评估的审计项目固有风险比率。
Finally, the method of weighted mean is used to calculate the inherent risk ratio of the audit.
工程经济学的基本方法,包括净现值分析法、寿命周期成本法、收益-成本分析法和其它项目评估方法。
Basic techniques of engineering economics, including net present value analysis, life-cycle costing, benefit-cost analysis, and other approaches to project evaluation are among the topics covered.
工程经济学的基本方法,包括净现值分析法、寿命周期成本法、收益-成本分析法和其它项目评估方法。
Basic techniques of engineering economics, including net present value analysis, life-cycle costing, benefit-cost analysis, and other approaches to project evaluation are among the topics covered.