工作分解结构是当前批准的项目范围说明书规定的工作。
The WBS represents the work specified in the current approved project scope statement.
项目范围说明书确定了项目的范围,即需要完成的诸种事项。
The project scope statement is the definition of the project—what needs to be accomplished.
详细的项目范围说明书列出的假设一般都比项目章程列出的多而详细。
The assumptions listed in the detailed project scope statement are typically more numerous and more detailed than the assumptions listed in the project charter.
范围定义——制定详细的项目范围说明书,作为将来项目决策的根据。
Scope definition-developing a detailed project scope statement as the basis for future project decisions.
2范围定义——制定详细的项目范围说明书,作为将来项目决策的根据。
2 2 scope definition-developing a detailed project scope statement as the basis for future project decisions.
详细的项目范围说明书列出的制约因素,一般都比项目章程列出的多而详细。
The constraints listed in the detailed project scope statement are typically more numerous and more detailed than the constraints listed in the project charter.
对可交付成果可以概括,也可以详细说明,具体视项目范围说明书的情况而定。
Depending on the project scope statement, the deliverables may be described at a summary level or in great detail.
项目范围说明书很重要,因为它:A。为制定未来项目的决策提供依据。
A project scope statement is important because it: A. Provides the basis for making future project decisions. B.
项目范围说明书还是所有项目利害关系者对项目范围的共同理解,说明了项目的主要目标。
The project scope statement also provides a common understanding of the project scope among all project stakeholders and describes the project's major objectives.
项目范围说明书详细地说明了项目的可交付成果和为提交这些可交付成果而必须开展的工作。
The project scope statement describes, in detail, the project's deliverables and the work required to create those deliverables.
如果实施组织不使用项目章程,则应取得或提出类似的信息,并用于制定详细的项目范围说明书。
If a project charter is not used in a performing organization, then comparable information needs to be acquired or developed, and used to develop the detailed project scope statement.
项目范围说明书的内容因项目的应用领域和复杂程度而异,因此可能包括上面列出的某些或全部内容。
The project scope statement content will vary depending upon the application area and complexity of the project and can include some or all of the components identified above.
经过批准的详细项目范围说明书,相应的工作分解结构,以及工作分解结构词汇表是项目的范围基准。 !
The approved detailed project scope statement and its associated WBS and WBS dictionary are the scope baseline for the project.
项目团队和其他对于项目初步范围说明书有深入看法的利害关系者,可以进行这样的分析并将结果形成文件。
The project team and other stakeholders, who have additional insight into the preliminary project scope statement, can perform and prepare the analyses.
产品范围说明书说明了项目应创造的产品、服务或成果的特征。
Describes the characteristics of the product, service, or result that the project was undertaken to create.
虽然这些特征的形式与实质彼此之间相差悬殊,但范围说明书应提供足够的细节配合后来的项目范围规划。
While the form and substance of the characteristics will vary, the scope description should always provide sufficient detail to support later project scope planning.
项目产品技术要求说明书的逐步完善务必要与项目范围的恰当定义谨慎地协调起来,在项目是按合同实施时,尤其应当如此。
Progressive elaboration of a project's specifications needs to be carefully coordinated with proper project scope definition, particularly if the project is performed under contract.
如果项目范围即需要完成的任务,规定得恰如其分,则即便是在产品技术要求说明书的逐步完善过程中,项目范围仍应保持控制状态。
When properly defined, the scope of the project-the work to be done-should be controlled as the project and product specifications are progressively elaborated.
如果项目范围即需要完成的任务,规定得恰如其分,则即便是在产品技术要求说明书的逐步完善过程中,项目范围仍应保持控制状态。
When properly defined, the scope of the project-the work to be done-should be controlled as the project and product specifications are progressively elaborated.