在需要之时,软件项目经理会在管理评审小组的帮助下更新软件开发计划。
The software project manager with the help of the management review team updates the software development plan as needed.
例如,如果您执掌被称为“项目管理委员会(PMC) ”的委员会,那么可以将“PM C ”作为输入评审栏的数据。
For instance, if your steering committee is called a "Project Management committee (PMC)," then enter "PMC" as a value in the appropriate review column.
管理代码评审、评价更高的能力,以确定开发项目的总体健康状况。
Greater ability to manage code review, measurements, and metrics to determine overall health of development projects.
通过提高代码管理、评审和评价的能力,来提高开发项目的强壮性。
Improve management visibility into the health of development projects by leveraging the ability to manage code reviews, metrics, and measurements.
如上面所提到的,评审是项目组合管理工作中的主要工作部分。
As mentioned above, reviews are a major work component of portfolio management.
项目组合管理工作重要的部分以评审的形式发生。
A significant part of the work of portfolio management takes place in the form of reviews.
当rfe被关闭之后,模型管理员或者执行者可以获取评审结果,并将验证后的变更整合到项目流中。
When it is closed, the model manager or practitioner can harvest the reviewed and validated changes into the project stream.
组织管理中明确定义项目组织结构、各自职责、项目沟通与评审,这样可以保证项目的顺利进行。
In organization phase, item organization framework, responsibility, item communication and evaluation are clearly defined so as to ensure the item to proceed smoothly.
国家科学基金会共有七个科学部负责不同学科申请项目的受理,评审与选择,以及批准资助后的管理。
Seven scientific departments in charge of the organization of proposal acceptance, evaluation and selection, and management of supporting.
软件评审可以用于支持项目管理、系统工程、验证和确认、配置管理和质量保证的目标。
Software reviews can be used in supporting of the objectives of project management, system engineering, verification and validation, configuration management and quality assurance.
第十三条基金管理机构应当聘请具有较高的学术水平、良好的职业道德的同行专家,对基金资助项目申请进行评审。
Article 13 the fund management organ shall employ the experts that have a fairly high academic level and good professional ethics in the same field to evaluate the applications for funded projects.
网络计划技术是一种制定计划和对项目进行管理的方法,最常用的即是关键线路法CPM和计划评审技术PERT。
The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.
一般而言,项目的市场、产品、管理团队、风险、项目价值等方面是投资人评审项目的要点。
Generally speaking, the project's market, products, management team, risk, project value of the investment projects were the main points of the assessment.
定期对项目开发进度、问题点组织项目小组人员召开项目评审会议,编制、汇总、更新项目管理报告;
Regularly organize project team members to open project review meetings to discuss project development progress and issues that arise. Formulate, compile and update Project Management Template;
并对关键链项目管理方法与传统的项目管理方法,如关键路径法、计划评审技术的优势和劣势进行了比较。
Then analyze the advantages and disadvantages of the traditional scheduling management method by comparison, such as CPM, PERT.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.
包括科研项目网上申报、评审系统、科研项目过程管理系统、科研信息管理系统。
This system mainly includes application project on line, auditing project of experts, processing management of scientific project, information management of scientific project.
本文应用基于遗传算法的模糊神经网络方法,建立了科研项目立项评审的智能管理系统。
An approach to the technology with fuzzy systems, neural networks and genetic algorithms is given.
评审委员将决定项目分类的适当性,也将决定每年国际项目管理大奖中各项目的得奖等级。
It is the jury who decides on the appropriateness of the category for the different Application Projects and who will decide on the level-position of each project in the annual IPMA Award contests.
与2006年国际项目管理大奖相同,申奖的项目将被大奖评审委员会根据几个因素分成2类。
As with the Award 2006 projects will be categorized by the IPMA Award Jury into two groups based on a number of criteria.
与2006年国际项目管理大奖相同,申奖的项目将被大奖评审委员会根据几个因素分成2类。
As with the Award 2006 projects will be categorized by the IPMA Award Jury into two groups based on a number of criteria.
应用推荐