忽略质量控制——时间压力有时会让程序员或项目团队有意跳过测试过程。
Neglecting quality control - time pressure can sometimes cause programmers or project teams to be tempted to skip testing.
管理员还可以通过给用户组分配文档类型和需求类型权限来控制项目文档和需求的访问。
Administrators also control access to project documents and requirements by assigning document type and requirement type permissions to user groups.
源控制与工作项之间的集成,允许开发员处理源控制之下的开发工件,同时浏览工作项项目透明性追踪更改。
The source control and work item integration allows developers to work with development artifacts under source control while tracking changes back to work items for project transparency.
大多数的软件开发管理员都想进一步了解及更好地控制项目的需求可追溯性功能。
Most software development managers would like to have a greater understanding of and better control over their project's requirements traceability functions.
同步和复制间隔由SCM项目管理员控制。
Synchronization and replication intervals are controlled by the SCM project administrator.
该项目Web站点指出,它“让程序员能够编写自己的机器人控制器、修改环境和使用可用的传感器。”
According to the project Web site, it "enables programmers to write their own robot controller, modify the environment, and use the available sensors."
源控制之下的项目可以按照以下的步骤来载入到开发员的Repositoryworkspace。
Projects already under source control can be loaded to a developer's Repository Workspace by following these steps.
任务控制协调员BrianJones在项目博客中说道:“这是项目运行7年来,我们第一次感到失望。
Mission-control coordinator Brian Jones wrote on the project’s blog: ‘This is the first time in the seven years that this project has been running that we have experienced this kind of disappointment.
在一个商业环境,这严重限制了数量的程序员可以将每个查询的项目,使质量控制上绝对必要的。
In a business environment this severely limits the number of programmers you can put onto the project and makes quality control of every query an absolute necessity.
在一个商业环境,这严重限制了数量的程序员可以将每个查询的项目,使质量控制上绝对必要的。
In a business environment this severely limits the number of programmers you can put onto the project and makes quality control of every query an absolute necessity.
应用推荐