今天,更低的IT预算正迫使组织寻找降低项目成本而不丧失竞争力,也不牺牲产品和服务质量的方法。
Today's lower it budgets are forcing organizations to find ways to reduce project costs without losing their competitiveness and sacrificing the quality of their products and services.
不仅项目成本远超过预算,而且一个成螺旋式状接近破产的城市并不需要更多的百万平方英尺的办公室空间。
Not only had the project cost far more than it was supposed to, but a city spiraling toward bankruptcy didn't exactly need millions more square feet of office space.
如果报告给管理的信息只是成本,那么将出现的情况是项目正在按照预算进行。
If the information being disclosed to management is cost only, then it would appear the project is running under budget.
一个由业务赞助的项目将拥有一个基于业务案例的预算,该预算平衡解决方案的收益和成本。
A business-sponsored project will have a budget based on a business case that balances cost against the benefit of a solution.
工作管理(Work Management)——计划、成本、预算、资源、项目时间安排以及非项目的工作。
Work Management - plan, cost, budget, resources and scheduling of project and non-project work.
在实际操作当中,无论详细的成本估算中是否包括了意外事件,项目预算都应列支一笔应急储备金。
Realistically, a budget accounting item for contingency allowance should be established whenever a contingency amount was included in the final cost estimate.
大多数人仍然希望自己的项目按时、按质、按预算完成。这就构成了著名的时间、质量和成本的三角关系。
Most people still want their projects to be on time, meet quality objectives, and not cost more than the budget. These form the classic time, quality, cost triangle.
当然,每一个项目都有时间,成本,预算的限制。
Of course, every project has time, costs, and budgetary constraints.
项目相关成本的预算控制及确认。
该预算成本也要定期更新,以反映完工前的预测成本,并确保项目完工前的现金投入。
The budgeted cost should also be updated periodically to reflect the estimated cost to completion as well as to insure adequate cash flows for the completion of the project.
并对晨星公司的ERP项目进行成本估算、预算及控制。
And carries on the cost estimate, the budget and the control to the morning star company's ERP project.
由于客户明确规定了预算,所以BSC公司选择使用成本较低的制作方式来完成该项目。
And because the customer's budget was specifically set, BSC was able to use less expensive, standard sign fabrication methods even when building in unique shapes.
预算本钱由项目初始阶段的具体成本估算得来。
The budgeted cost is derived from the detailed cost estimate prepared at the start of the project.
严格执行公司财务制度,加强项目预算、成本管理。
Strict implementation of the company"s financial system, strengthening the project budget, cost management approval."
针对口径上的差异,对建筑产品工程实际成本与预算成本项目如何调整进行了探讨,并提出改进的建议。
Judging from this, the way of the adjustment of the actual and budget cost items of construction projects is discussed, and Suggestions for improvement are put forward.
项目成本管理包括与成本计划、成本估算、成本预算、成本控制相关的过程,用以确保项目能在核准预算内完成。
Project cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget.
第一章,成本低,包括项目所作的预算过低,如婚礼邀请,问候或自我推销件,除其他的例子。
The first chapter, Low Cost , includes projects made on a low budget such as wedding invites, greetings or self-promotion pieces, among other examples.
负责车间的资金预算,维持当前运作预算和内部成本,维持项目有足够的消费品和库存。
Responsible for Workshop Department capital budget forecasts, maintaining current operational budgets and internal costs, maintaining sufficient consumables and stocks for the projects.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
贴现率—用于确定现金流的现值的利率。在分析资本预算项目时,贴现率通常就是资本成本。
Discount rate - Interest rate used to determine the present value of cash flows. For analyzing capital budgeting projects, the discount rate is usually the cost of capital.
软件项目管理中的成本管理主要表现在项目的估算、预算和控制等方面。
In the software project management's cost management mainly displays in aspects and so on project estimate, budget and control.
实行突变管理,在项目预算中准备应急费用,是追求项目最终目标(高质量、短工期、低成本)的一种有效途径。
Contingency management, together with contingency funds, included in the project budget, is an effective way to realize the ultimate project objectives.
最后,论述了标后预算管理与项目成本管理之间的关系。
Finally, the relationship between the superscript after the budget management and the cost management is discussed.
公路工程的投标报价不等于工程概预算,它是通过概预算方法工程细目的预期单价和费用,进而预测建设项目成本和在此基础上的利润。
The biding quotation method is researched in detail so as to put forward a perfect method which is helpful for the subsist and development of the construction cooperation.
项目的大多数材料要求由本地工厂制造,原料也要求就近供应以减少成本,满足客户有限的预算。
Most of the work had to be done from the local factory, and materials have had to be sourced from a close-by supply to reduce impact on our cost and the Client's limited budgets.
编辑项目经理在确保编辑产品时效性和质量的同时,负责控制项目的直接和间接成本预算。
The Editorial Project Manager will be responsible in maintaining budget ownership for direct and indirect costs while ensuring timeliness and quality of editorial production.
关注项目成本的有效方案和活动,确保项目成本控制在投标阶段的预算范围内。
Observe the need to apply cost effective solutions and participate in ensuring costs are controlled within estimate.
编制项目预算,控制项目运行成本;
编制项目预算,控制项目运行成本;
应用推荐