• 约瑟夫·施特劳斯(Joseph Strauss)是金门大桥项目程师

    Joseph Strauss was the chief engineer of the Golden Gate Bridge project.

    youdao

  • 幕后推动者史蒂芬·埃尔特穆斯,他休斯敦约翰逊航天中心担任程师

    The driving force behind the project was Stephen J. Altemus, the chief engineer at the Johnson Space Centre in Houston.

    youdao

  • EADS项目程师安迪.霍金斯说:“原材料只为用来生产需要产品”,团队生产出的部件更加精细,轻盈

    “You only put material where you need to have material,” says Andy Hawkins, lead engineer on the EADS project. The parts his team is making are more svelte, even elegant.

    youdao

  • 的一些程师依靠冷却其他一些技术,使得青藏铁路在未来50能够抵御土壤0.2摄氏度和气温变暖2摄氏度

    The project's chief engineers counted on cooling sticks and other tricks to help the rails withstand soil warming of 0.2 degree C and air warming of 2 degrees C on the plateau over the next 50 years.

    youdao

  • 总工程师:负责电子材料物料承认书审批代替项目经理审批新物料承认书。

    The project manager: shall responsible for the confirmation of the that is the structure and package new materials.

    youdao

  • 项目程师姚志军说: :“中国铁路总公司有史以来修建难度最高隧道。”

    "It has been the most difficult tunnel that China Railway ever built, " said Yao Zhijun, chief engineer of the project.

    youdao

  • 程师负责电子材料物料承认审批,代替项目经理审批新物料承认书。

    The general engineer: shall responsible for the approval of the that is the electronic new materials, or the confirmation instead of the project manager.

    youdao

  • 统计表明典型软件开发项目,软件测试的工作量到了软件开发总工作量的40%甚至更多

    Statistics show that, in typical software development projects, the work of software testing accounts for 40% or more of all.

    youdao

  • 提出了如果需要达到最优化压缩目的需要预测整个项目期的问题,第四章的研究提出要求

    Besides, it lodges that, to reach the aim of optimizing compress, there needs to forecast the best total time for an entire project, bringing forward a request for study of chapter four.

    youdao

  • 工资扣除所有项目剩余数额最终放入钱包中的钱。

    Net the amount left after all deductions have been made from the gross income. This is what you finally get to put in your pocket!

    youdao

  • 典型软件开发项目中,软件测试工作量通常软件开发作量40%以上。

    In the typical software development item, the work load of software test usually accounts for more than 40% of the total work load of software development.

    youdao

  • 决策层项目经理项目经理、程师

    Decision-making level: Project Manager, Deputy Project Manager, General Project Engineer;

    youdao

  • 决策层项目经理项目经理、程师

    Decision-making level: Project Manager, Deputy Project Manager, General Project Engineer;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定