• 不莱斯约翰逊环境工程负责协调科学和尚“的项目

    Science may be far advanced in the West, but a moral vacuum exists, said Bryce Johnson, an environmental engineer who coordinates the Science for Monks program.

    youdao

  • 海外项目钻机遣散动员一项复杂系统工程涉及部门人员资料多,组织协调难度大。

    Demobilization and mobilization of drilling rig of overseas project is complex system engineering, involving many departments and persons and information as well as hard organization and coordination.

    youdao

  • 项目所在地海拔生态环境脆弱又是旅游胜地,做到公路建设环境保护协调统一是工程核心内容。

    Due to lying in the area of high altitude, vulnerable ecology and tourism, this project bears the core task of coordinating road construction and environmental protection.

    youdao

  • 作为各部门项目关键协调人,协调有关工程制造质量采购财务部门的项目工作和资源分配;

    Serve as central point of communication and coordination with the cross-functional Program Team, includes engineering, manufacturing, quality, purchasing, finance, etc.

    youdao

  • 施工项目经理负责企划、组织指导控制协调土木工程建筑工程施工以及管理在建筑和施工过程中涉及到物力和人力资源

    Plan, organise, direct, control and coordinate the construction of civil engineering projects, buildings and dwellings, and the physical and human resources involved in building and construction.

    youdao

  • 领导团队项目执行协调部门有关制造工程事务。

    Lead team on project and programs implementation by coordinate cross-functional interdepartmental activities.

    youdao

  • 项目有一个项目经理我们客户一起协调所有施工和安装,确保工程环节同步推进最后按时完工。

    A Heliono project manager coordinates all engineering and installation activities with our customers to properly phase all aspects of the project and meet critical schedule dates.

    youdao

  • 同时实现两个目标重要手段就是通过工程项目费用进度进行协调控制

    But the important means to achieve these two objectives at the same time is the Earned Value Method which is mean of project cost and schedule co-ordinate control.

    youdao

  • 本人具体负责大运主场馆所在地龙岗片区网络规划工程项目协调工作

    I am specifically responsible for the main venues are located in Longgang Grand Canal Area of network planning and project coordination.

    youdao

  • 融入到我们新型开发项目力求设计出低耗能高性能亲近生活协调社会,适合二十一世纪人类使用建筑工程配套设备

    Into our new development projects, and strive to design low-power, high performance, close to life, the coordination of society for the twenty-first century, human use of construction equipments.

    youdao

  • 工作城市:上海 职位描述: •根据公司的制度标准进行项目管理,包括项目前期准备和现场工程协调及验收交工

    Location: Shanghai Main Responsibilities: -Provide project management services to ICD's clients in accordance to ICD's policy and standard.

    youdao

  • [摘要]指出分包合同示范文本修订过程保证修订范本我国现行工程清单计价模式相互协调重点解决三个方面问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

    Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

    youdao

  • [摘要]指出分包合同示范文本修订过程保证修订范本我国现行工程清单计价模式相互协调重点解决三个方面问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

    Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

    youdao