定期向直接主管领导汇报项目实施进度并编写工作报告。
To report to the immediate manager on a regular basis on work progre and to produce the reports.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
欧盟驻外机构将根据这一计划在援助项目实施上发挥更大的作用,同时在欧盟内部将建立一个更加精干的组织以加快援助进度。
EU missions abroad will get a bigger role in implementing programmes on the ground, while a better staffed organisation will be set up within the Commission to speed up aid delivery.
“要实施一个项目,意味着我们要把10- 15个人喊到一块,并花费大量的时间分配进度,”他说道。
"To get any project delivered meant we had to get 10 to 15 people together, and we spent a lot of time on scheduling," he says.
项目实施时制定具体施工方案和项目执行过程中对安装进度计划并进行调整、控制。
When the implementation of the programme and formulate specific construction project on the installation progress plan and to make an adjustment, control.
对于进度控制,可以将项目活动的实际进度和项目的计划进度进行比较,以监督项目的进度实施。
For schedules, progress on individual activities can be compared with the project schedule to monitor the progress of activities.
本文首先介绍了本项目的概况,在此基础上分析了项目工程的特点和施工重难点,指出项目进度控制是实施该项目的最关键部分。
At first, this paper introduced the overview of the project, and then analyzed its characteristics, importance and difference, and pointed out it 's the most crucial part to control the progress.
因此,在研发项目实施之前开展进度风险分析十分必要。
Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.
根据项目进度实施试验,根据客户要求使用不同的仪器设备完成测试。
Perform testing according to project schedule, use different equipments and devices to achieve testing according to different client requirements.
Chung表示:“任何新系统的实施,良好的项目管理都是保持进度的关键。
In any new system implementation, good project management is critical to keeping schedules.
制定一套科学、高效的项目实施计划并按计划进行进度控制是成功实施项目管理,使工程按期投产的主要因素。
It is crucial for successful project management and schedule control to have a scientific and efficient project execution plan.
批准的变更请求由项目团队安排实施的时间进度。
Approved change requests are scheduled for implementation by the project team.
项目实施时制定具体施工方案和项目执行过程中对安装进度计划并进行调整、控制。
Construction of the project implementation, to develop specific programs and project implementation process on the installation schedule and make adjustments to control.
它的出现,使得企业能够在项目的成本、质量以及实施的进度等方面达到一个合理的平衡点。
Using the technologies of project management, enterprises can achieve the reasonable balance point in cost, quality and time.
软件项目管理是整个系统集成项目管理中的一个重要组成部分,它能够减少软件项目开发成本,加速软件项目的开发进度,因此成为了各企业实施项目管理的重点。
As an important part of project Management of System Integration, software PM can reduce the exploitation cost of software project, and accelerate the exploitation plan of software project.
项目实施时制定具体施工方案和项目执行过程中对安装进度计划并进行调整、控制。
Construction of the project implementation, to develop specific programs and projects in the implementation process on the installation schedule and make adjustments to control.
石油工程项目实施低成本战略,关键是对项目的进度、成本与质量进行有效地控制。
The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.
介绍了P3软件的背景及该软件作为项目进度管理软件应用于化肥“油改煤”工程的思路、方法及具体实施步骤。
This paper introduces P3 software background and its application as managing project to "coal for oil" chemical fertilizer. Methods and their steps are interpreted.
摘要:根据建设项目进度控制的功能需求,提出基于BIM的进度控制平台构架以及实施流程。
Abstract: According to functions of progress control, proposes the structure and implementation process of progress management platform based on BIM.
介绍了国际工程项目合同管理的主要内容、主要业务程序进度和主要工作的实施。
This paper introduces the main contents, the major businesses' procedures and the implementation of the main works of the contract management of the international engineering projects.
IT项目管理中的重要一环是IT项目的进度管理,而项目的进度又往往是IT项目实施中最薄弱的环节。
With the rapid growth in domestic IT industry, IT project management is becoming the most important problem in the research and development of IT projects.
编制并实施刀具项目时间进度,保证项目整体进度;
Schedule and carry out the tools relevant projects, make sure project schedule;
而在软件项目管理过程中,项目进度的计划和控制管理是决定项目能否顺利实施的关键内容。
It is known that the vital elements in managing software project must be planning and controlling of the project.
在项目的规划与实施中,分别对项目组织的规划、工作结构分析、项目进度规划及风险管理、成本控制、质量控制等方面进行了研究。
In the project's implementation and control, respectively, the formation of the project team, risk management, cost control, quality control, a study.
成本控制是项目成本管理的一个重要环节,在项目成本管理实施中最重要的控制要点就是对成本与进度的集成控制。
Cost control is an important component of cost management of the project, of which the most important implementation is to integrated control costs and the progress of the construction.
综合运用各种项目管理方法和手段,有效地保证了项目的进度实施和成本控制。
By using these project management methods and skills, this project was undertaken successfully following the planned schedule and estimated cost.
论文特别对项目管理实施程序及矩阵式管理过程中如何实施进度、质量、费用等控制进行了较深入的探讨。
Particularly, this thesis has given in-depth discussion about implementation procedure of project management and schedule (or quality or cost) control with matrix management.
同时还要妥善处理项目实施中安全目标与进度目标的矛盾,方能达到预期目的。
The anticipated blasting goal relied on the proper contradiction between the progress and safety goals.
负责对本项目的进度、质量、成本等实施。计划、组织、协调、控制和决策,对项目各要素实施全过程的动态管理。
The development putting the entire proceeding into practice manages the plan, organization, coordination, under the control of and every key element making policy, to the project.
负责对本项目的进度、质量、成本等实施。计划、组织、协调、控制和决策,对项目各要素实施全过程的动态管理。
The development putting the entire proceeding into practice manages the plan, organization, coordination, under the control of and every key element making policy, to the project.